Key Insights
The European data center construction market, valued at €13.24 billion in 2025, is projected to experience robust growth, exhibiting a compound annual growth rate (CAGR) of 8.36% from 2025 to 2033. This expansion is fueled by several key drivers. The burgeoning digital economy, characterized by increasing data generation and storage needs across sectors like banking, finance, insurance (BFSI), IT and telecommunications, and government, necessitates substantial investment in data center infrastructure. Furthermore, the rising adoption of cloud computing, edge computing, and the Internet of Things (IoT) further fuels demand for advanced and geographically distributed data centers. Government initiatives promoting digital transformation and cybersecurity also contribute significantly. While land availability and high construction costs present certain restraints, the market's overall trajectory is positive, driven by the insatiable need for computing power and data storage. Segmentation reveals that Tier-I and Tier-II data centers dominate, reflecting the preference for high-capacity, resilient infrastructure. Major players like Jacobs Solutions, Whiting-Turner, and others are strategically positioned to capitalize on this growth, focusing on delivering innovative, sustainable, and scalable solutions. The market's regional distribution across Germany, France, the UK, and other European nations reflects varying levels of digital maturity and investment capacity within each country.
The forecast period (2025-2033) anticipates a significant expansion of the European data center construction market. The continued growth in cloud services, alongside evolving regulatory landscapes promoting data sovereignty and security, will shape future market dynamics. Competition among construction companies will likely intensify, with a focus on specialization and technological advancements in building sustainable and energy-efficient data centers. Growth in specific sectors, such as healthcare and government, will present lucrative opportunities for specialized construction firms. The ongoing development of high-speed connectivity networks will further drive the need for geographically distributed data centers, broadening the market’s reach beyond major urban centers. The long-term outlook remains positive, suggesting continued growth and increasing complexity in data center design and construction requirements.
United States Data Center Construction Market: A Comprehensive Report (2019-2033)
This insightful report provides a comprehensive analysis of the United States data center construction market, offering a detailed overview of market dynamics, key players, growth drivers, and future opportunities. Covering the period from 2019 to 2033, with a focus on 2025, this report is essential for stakeholders seeking to understand and capitalize on the burgeoning data center construction landscape. The market is projected to reach USD xx Million by 2033.

United States Data Center Construction Market Composition & Trends
This section delves into the competitive landscape of the US data center construction market, analyzing market concentration, innovation drivers, regulatory influences, substitute products, end-user profiles, and merger & acquisition (M&A) activities. We examine the market share distribution among key players, revealing the dominance of specific firms and the overall level of market consolidation. Further, we analyze the value and impact of recent M&A deals, highlighting strategic implications for market participants. The analysis incorporates data from the historical period (2019-2024), the base year (2025), and the forecast period (2025-2033).
- Market Concentration: Analysis of market share distribution amongst top players, including Jacobs Solutions Inc, Whiting-Turner Contracting Company, Gilbane Building Company, DPR Construction, McCarthy Building Companies Inc, Hensel Phelps, Brasfield & Gorrie LL, Balfour Beatty US, AECOM, and Skanska USA. The market is estimated to be moderately concentrated, with the top five players holding approximately xx% of the market share in 2025.
- Innovation Catalysts: Examination of technological advancements driving innovation, such as advancements in sustainable building materials and energy-efficient cooling systems.
- Regulatory Landscape: Assessment of federal, state, and local regulations impacting data center construction, including zoning laws, building codes, and environmental regulations.
- Substitute Products: Analysis of alternative construction methods and materials that could impact market growth.
- End-User Profiles: Detailed profiles of end-users across Banking, Financial Services, and Insurance; IT and Telecommunications; Government and Defense; Healthcare; and Other End Users, including their specific data center requirements.
- M&A Activities: Review of significant M&A deals in the data center construction sector during the study period, with an analysis of their impact on market dynamics and deal values totaling USD xx Million.

United States Data Center Construction Market Industry Evolution
This section provides an in-depth analysis of the evolution of the US data center construction market, charting its growth trajectory, technological advancements, and shifting consumer demands. It examines the factors influencing market growth rates and adoption metrics across various segments, including Tier-I and -II, Tier-III, and Tier-IV data centers. Data points from 2019 to 2024 are used to establish historical trends, providing a robust foundation for forecasting future growth from 2025 to 2033. The impact of emerging technologies like AI and IoT on data center design and construction is explored, along with the increasing demand for sustainable and energy-efficient solutions. The evolving needs of end-users and the influence of macroeconomic factors are also examined.
Leading Regions, Countries, or Segments in United States Data Center Construction Market
This section identifies the leading regions, countries, or segments within the US data center construction market. We analyze the key drivers behind their dominance across End-User segments (Banking, Financial Services, and Insurance; IT and Telecommunications; Government and Defense; Healthcare; Other End Users), Infrastructure segments (Electrical Infrastructure, Mechanical Infrastructure, General Construction), and Tier Types (Tier-I and -II, Tier-III, Tier-IV).
- Key Drivers:
- Investment Trends: Analysis of investment patterns across different regions and segments.
- Regulatory Support: Assessment of regional and local government policies supporting data center development.
- Dominance Factors: In-depth analysis of factors contributing to the dominance of specific regions, countries, and segments. For example, the strong presence of tech companies in specific regions fuels the demand for data centers, impacting growth.
United States Data Center Construction Market Product Innovations
This section examines recent product innovations within the US data center construction market. This includes advancements in modular data center designs, prefabricated components, and sustainable building materials. The analysis focuses on the unique selling propositions (USPs) of these innovations, highlighting their impact on construction efficiency, cost reduction, and environmental sustainability. Key performance metrics are included, focusing on improved energy efficiency, reduced construction timelines, and enhanced operational reliability.
Propelling Factors for United States Data Center Construction Market Growth
Several factors are driving the growth of the US data center construction market. These include the exponential growth of data generation fueled by cloud computing, the increasing adoption of 5G technology, and government initiatives promoting digital infrastructure development. Strong demand from various end-users like financial institutions, tech companies, and government agencies further contributes to market expansion. The rising need for secure and resilient data storage further compels this growth.
Obstacles in the United States Data Center Construction Market Market
Despite strong growth prospects, the US data center construction market faces certain challenges. These include securing necessary permits and approvals, navigating complex regulatory frameworks, and managing supply chain disruptions impacting material availability and costs. Competition from established players can also pose challenges to new entrants. These obstacles can lead to project delays and increased costs, impacting market growth trajectory.
Future Opportunities in United States Data Center Construction Market
The US data center construction market presents significant future opportunities. The increasing adoption of edge computing, the growing demand for hyperscale data centers, and the expanding focus on sustainability in the construction industry offer significant growth potential. Investments in innovative technologies and sustainable practices are expected to shape the future of the data center construction market.
Major Players in the United States Data Center Construction Market Ecosystem
- Jacobs Solutions Inc
- Whiting-Turner Contracting Company
- Gilbane Building Company
- DPR Construction
- McCarthy Building Companies Inc
- Hensel Phelps
- Brasfield & Gorrie LL
- Balfour Beatty US
- AECOM
- Skanska USA
Key Developments in United States Data Center Construction Market Industry
- February 2024: Prime Data Centers proposed a USD 1.3 Billion data center complex in Caldwell County, Texas. This signifies a significant investment boosting demand for construction services.
- November 2023: H5 Data Centres announced the expansion of its San Antonio data center, adding up to 340 cabinets and 1.5 MW of UPS capacity. This highlights the ongoing expansion within the existing data center infrastructure.
- 2023: Five new telecommunications operators deployed infrastructure on a data center campus, demonstrating the increasing importance of network connectivity.
Strategic United States Data Center Construction Market Market Forecast
The US data center construction market is poised for robust growth, driven by sustained demand from various sectors. Continued investment in digital infrastructure, the expansion of cloud computing and 5G networks, and the increasing adoption of sustainable construction practices will contribute to this growth. The market is expected to witness significant expansion in the coming years, presenting lucrative opportunities for established players and new entrants alike.
United States Data Center Construction Market Segmentation
-
1. Infrastructure
-
1.1. Electrical Infrastructure
- 1.1.1. UPS Systems
- 1.1.2. Other Electrical Infrastructure
-
1.2. Mechanical Infrastructure
- 1.2.1. Cooling Systems
- 1.2.2. Racks
- 1.2.3. Other Mechanical Infrastructure
- 1.3. General Construction
-
1.1. Electrical Infrastructure
-
2. Tier Type
- 2.1. Tier-I and -II
- 2.2. Tier-III
- 2.3. Tier-IV
-
3. End User
- 3.1. Banking, Financial Services, and Insurance
- 3.2. IT and Telecommunications
- 3.3. Government and Defense
- 3.4. Healthcare
- 3.5. Other End Users
United States Data Center Construction Market Segmentation By Geography
- 1. United States

United States Data Center Construction Market REPORT HIGHLIGHTS
Aspects | Details |
---|---|
Study Period | 2019-2033 |
Base Year | 2024 |
Estimated Year | 2025 |
Forecast Period | 2025-2033 |
Historical Period | 2019-2024 |
Growth Rate | CAGR of 8.36% from 2019-2033 |
Segmentation |
|
Table of Contents
- 1. Introduction
- 1.1. Research Scope
- 1.2. Market Segmentation
- 1.3. Research Methodology
- 1.4. Definitions and Assumptions
- 2. Executive Summary
- 2.1. Introduction
- 3. Market Dynamics
- 3.1. Introduction
- 3.2. Market Drivers
- 3.2.1 4.; Growing Cloud Applications
- 3.2.2 AI
- 3.2.3 and Big Data4.; Rising Adoption of Hyperscale Data Centers
- 3.3. Market Restrains
- 3.3.1. 4.; Increase in Real Estate Costs
- 3.4. Market Trends
- 3.4.1. UPS Systems to Lead the Electrical Infrastructure Segment
- 4. Market Factor Analysis
- 4.1. Porters Five Forces
- 4.2. Supply/Value Chain
- 4.3. PESTEL analysis
- 4.4. Market Entropy
- 4.5. Patent/Trademark Analysis
- 5. United States Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 5.1.1. Electrical Infrastructure
- 5.1.1.1. UPS Systems
- 5.1.1.2. Other Electrical Infrastructure
- 5.1.2. Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.2.2. Racks
- 5.1.2.3. Other Mechanical Infrastructure
- 5.1.3. General Construction
- 5.1.1. Electrical Infrastructure
- 5.2. Market Analysis, Insights and Forecast - by Tier Type
- 5.2.1. Tier-I and -II
- 5.2.2. Tier-III
- 5.2.3. Tier-IV
- 5.3. Market Analysis, Insights and Forecast - by End User
- 5.3.1. Banking, Financial Services, and Insurance
- 5.3.2. IT and Telecommunications
- 5.3.3. Government and Defense
- 5.3.4. Healthcare
- 5.3.5. Other End Users
- 5.4. Market Analysis, Insights and Forecast - by Region
- 5.4.1. United States
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 6. Germany United States Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 6.1. Market Analysis, Insights and Forecast - By Country/Sub-region
- 6.1.1. undefined
- 7. France United States Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 7.1. Market Analysis, Insights and Forecast - By Country/Sub-region
- 7.1.1. undefined
- 8. United Kingdom United States Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 8.1. Market Analysis, Insights and Forecast - By Country/Sub-region
- 8.1.1. undefined
- 9. Netherlands United States Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 9.1. Market Analysis, Insights and Forecast - By Country/Sub-region
- 9.1.1. undefined
- 10. Ireland United States Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 10.1. Market Analysis, Insights and Forecast - By Country/Sub-region
- 10.1.1. undefined
- 11. Switzerland United States Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 11.1. Market Analysis, Insights and Forecast - By Country/Sub-region
- 11.1.1. undefined
- 12. Denmark United States Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 12.1. Market Analysis, Insights and Forecast - By Country/Sub-region
- 12.1.1. undefined
- 13. Sweden United States Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 13.1. Market Analysis, Insights and Forecast - By Country/Sub-region
- 13.1.1. undefined
- 14. Italy United States Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 14.1. Market Analysis, Insights and Forecast - By Country/Sub-region
- 14.1.1. undefined
- 15. Poland United States Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 15.1. Market Analysis, Insights and Forecast - By Country/Sub-region
- 15.1.1. undefined
- 16. Norway United States Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 16.1. Market Analysis, Insights and Forecast - By Country/Sub-region
- 16.1.1. undefined
- 17. Austria United States Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 17.1. Market Analysis, Insights and Forecast - By Country/Sub-region
- 17.1.1. undefined
- 18. Spain United States Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 18.1. Market Analysis, Insights and Forecast - By Country/Sub-region
- 18.1.1. undefined
- 19. Rest of Europe United States Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 19.1. Market Analysis, Insights and Forecast - By Country/Sub-region
- 19.1.1. undefined
- 20. Competitive Analysis
- 20.1. Market Share Analysis 2024
- 20.2. Company Profiles
- 20.2.1 Jacobs Solutions Inc
- 20.2.1.1. Overview
- 20.2.1.2. Products
- 20.2.1.3. SWOT Analysis
- 20.2.1.4. Recent Developments
- 20.2.1.5. Financials (Based on Availability)
- 20.2.2 Whiting-turner Contracting Company
- 20.2.2.1. Overview
- 20.2.2.2. Products
- 20.2.2.3. SWOT Analysis
- 20.2.2.4. Recent Developments
- 20.2.2.5. Financials (Based on Availability)
- 20.2.3 Gilbane Building Company
- 20.2.3.1. Overview
- 20.2.3.2. Products
- 20.2.3.3. SWOT Analysis
- 20.2.3.4. Recent Developments
- 20.2.3.5. Financials (Based on Availability)
- 20.2.4 DPR Construction
- 20.2.4.1. Overview
- 20.2.4.2. Products
- 20.2.4.3. SWOT Analysis
- 20.2.4.4. Recent Developments
- 20.2.4.5. Financials (Based on Availability)
- 20.2.5 McCarthy Building Companies Inc
- 20.2.5.1. Overview
- 20.2.5.2. Products
- 20.2.5.3. SWOT Analysis
- 20.2.5.4. Recent Developments
- 20.2.5.5. Financials (Based on Availability)
- 20.2.6 Hensel Phelps
- 20.2.6.1. Overview
- 20.2.6.2. Products
- 20.2.6.3. SWOT Analysis
- 20.2.6.4. Recent Developments
- 20.2.6.5. Financials (Based on Availability)
- 20.2.7 Brasfield & Gorrie LL
- 20.2.7.1. Overview
- 20.2.7.2. Products
- 20.2.7.3. SWOT Analysis
- 20.2.7.4. Recent Developments
- 20.2.7.5. Financials (Based on Availability)
- 20.2.8 Balfour Beatty US
- 20.2.8.1. Overview
- 20.2.8.2. Products
- 20.2.8.3. SWOT Analysis
- 20.2.8.4. Recent Developments
- 20.2.8.5. Financials (Based on Availability)
- 20.2.9 AECOM
- 20.2.9.1. Overview
- 20.2.9.2. Products
- 20.2.9.3. SWOT Analysis
- 20.2.9.4. Recent Developments
- 20.2.9.5. Financials (Based on Availability)
- 20.2.10 Skanska USA
- 20.2.10.1. Overview
- 20.2.10.2. Products
- 20.2.10.3. SWOT Analysis
- 20.2.10.4. Recent Developments
- 20.2.10.5. Financials (Based on Availability)
- 20.2.1 Jacobs Solutions Inc
List of Figures
- Figure 1: United States Data Center Construction Market Revenue Breakdown (Million, %) by Product 2024 & 2032
- Figure 2: United States Data Center Construction Market Share (%) by Company 2024
List of Tables
- Table 1: United States Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 2: United States Data Center Construction Market Volume K Unit Forecast, by Region 2019 & 2032
- Table 3: United States Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 4: United States Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 5: United States Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 6: United States Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 7: United States Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 8: United States Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 9: United States Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 10: United States Data Center Construction Market Volume K Unit Forecast, by Region 2019 & 2032
- Table 11: United States Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 12: United States Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 13: United States Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 14: United States Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 15: United States Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 16: United States Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 17: United States Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 18: United States Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 19: United States Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 20: United States Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 21: United States Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 22: United States Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 23: United States Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 24: United States Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 25: United States Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 26: United States Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 27: United States Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 28: United States Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 29: United States Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 30: United States Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 31: United States Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 32: United States Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 33: United States Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 34: United States Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 35: United States Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 36: United States Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 37: United States Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 38: United States Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 39: United States Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 40: United States Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 41: United States Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 42: United States Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 43: United States Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 44: United States Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 45: United States Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 46: United States Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
Frequently Asked Questions
1. What is the projected Compound Annual Growth Rate (CAGR) of the United States Data Center Construction Market?
The projected CAGR is approximately 8.36%.
2. Which companies are prominent players in the United States Data Center Construction Market?
Key companies in the market include Jacobs Solutions Inc, Whiting-turner Contracting Company, Gilbane Building Company, DPR Construction, McCarthy Building Companies Inc, Hensel Phelps, Brasfield & Gorrie LL, Balfour Beatty US, AECOM, Skanska USA.
3. What are the main segments of the United States Data Center Construction Market?
The market segments include Infrastructure, Tier Type, End User.
4. Can you provide details about the market size?
The market size is estimated to be USD 13.24 Million as of 2022.
5. What are some drivers contributing to market growth?
4.; Growing Cloud Applications. AI. and Big Data4.; Rising Adoption of Hyperscale Data Centers.
6. What are the notable trends driving market growth?
UPS Systems to Lead the Electrical Infrastructure Segment.
7. Are there any restraints impacting market growth?
4.; Increase in Real Estate Costs.
8. Can you provide examples of recent developments in the market?
In February 2024, in Caldwell County outside of Austin, Texas, Prime Data Centers proposed to construct a USD 1.3 billion data center complex. Such investments from the data center providers will create more demand for DC construction players in the near future.
9. What pricing options are available for accessing the report?
Pricing options include single-user, multi-user, and enterprise licenses priced at USD 3800, USD 4500, and USD 5800 respectively.
10. Is the market size provided in terms of value or volume?
The market size is provided in terms of value, measured in Million and volume, measured in K Unit.
11. Are there any specific market keywords associated with the report?
Yes, the market keyword associated with the report is "United States Data Center Construction Market," which aids in identifying and referencing the specific market segment covered.
12. How do I determine which pricing option suits my needs best?
The pricing options vary based on user requirements and access needs. Individual users may opt for single-user licenses, while businesses requiring broader access may choose multi-user or enterprise licenses for cost-effective access to the report.
13. Are there any additional resources or data provided in the United States Data Center Construction Market report?
While the report offers comprehensive insights, it's advisable to review the specific contents or supplementary materials provided to ascertain if additional resources or data are available.
14. How can I stay updated on further developments or reports in the United States Data Center Construction Market?
To stay informed about further developments, trends, and reports in the United States Data Center Construction Market, consider subscribing to industry newsletters, following relevant companies and organizations, or regularly checking reputable industry news sources and publications.
Methodology
Step 1 - Identification of Relevant Samples Size from Population Database



Step 2 - Approaches for Defining Global Market Size (Value, Volume* & Price*)

Note*: In applicable scenarios
Step 3 - Data Sources
Primary Research
- Web Analytics
- Survey Reports
- Research Institute
- Latest Research Reports
- Opinion Leaders
Secondary Research
- Annual Reports
- White Paper
- Latest Press Release
- Industry Association
- Paid Database
- Investor Presentations

Step 4 - Data Triangulation
Involves using different sources of information in order to increase the validity of a study
These sources are likely to be stakeholders in a program - participants, other researchers, program staff, other community members, and so on.
Then we put all data in single framework & apply various statistical tools to find out the dynamic on the market.
During the analysis stage, feedback from the stakeholder groups would be compared to determine areas of agreement as well as areas of divergence