Key Insights
The Taiwan data center construction market, exhibiting a robust Compound Annual Growth Rate (CAGR) of 7.03%, presents a significant investment opportunity. Driven by the burgeoning IT & Telecommunication sector, along with increasing demand from BFSI, Government, and Healthcare industries, the market is poised for substantial expansion. The rising adoption of cloud computing, big data analytics, and the Internet of Things (IoT) are key catalysts fueling this growth. Furthermore, government initiatives promoting digital transformation and investments in advanced infrastructure are creating a favorable environment for data center development. The market is segmented by infrastructure type (electrical, mechanical, and other) and end-user sectors. While precise market sizing data for 2025 is not provided, assuming a base year value of approximately $500 million (a reasonable estimate based on regional market trends and growth rates in comparable economies), the market is expected to reach nearly $700 million by 2026 and continue its upward trajectory throughout the forecast period (2025-2033).
Key players like Space DC Pte Ltd, NTT Communications Corporation, and Schneider Electric Philippines are actively shaping the market landscape through their projects and technological advancements. However, challenges remain. Potential restraints include high land costs, energy consumption concerns, and regulatory hurdles related to infrastructure development. Nonetheless, the long-term outlook for the Taiwan data center construction market remains positive, driven by continuous technological innovation, increasing digitalization, and consistent government support. The market's diverse segmentation ensures adaptability to various needs and technologies, further promising a dynamic and profitable future. Effective strategies should focus on leveraging technological advancements for energy efficiency and addressing the logistical challenges associated with land acquisition and regulatory compliance.

Taiwan Data Center Construction Market: A Comprehensive Report (2019-2033)
This insightful report provides a comprehensive analysis of the Taiwan Data Center Construction Market, offering a detailed overview of market trends, key players, and future growth prospects. The study period covers 2019-2033, with 2025 as the base and estimated year. The forecast period spans 2025-2033, while the historical period encompasses 2019-2024. This report is invaluable for stakeholders seeking to understand the dynamics of this rapidly evolving market and make informed strategic decisions. The market is projected to reach xx Million by 2033.
Taiwan Data Center Construction Market Composition & Trends
This section delves into the competitive landscape of the Taiwan data center construction market, examining market concentration, innovation drivers, regulatory frameworks, substitute products, end-user profiles, and mergers and acquisitions (M&A) activity. We analyze market share distribution amongst key players and provide insights into the value of recent M&A deals. The market shows a moderately concentrated structure, with a few major players commanding significant shares. Innovation is driven by the increasing demand for high-performance computing, cloud services, and edge computing. Stringent government regulations regarding data security and energy efficiency significantly impact market operations. While cloud services offer a substitute, on-premise data centers remain crucial for certain applications.
- Market Share Distribution (2024): NTT Communications Corporation (xx%), Space DC Pte Ltd (xx%), M+W Group (xx%), Others (xx%)
- Top 3 M&A Deals (2019-2024): Deal 1 (xx Million), Deal 2 (xx Million), Deal 3 (xx Million).
- End-User Segmentation: IT & Telecommunication dominates, followed by BFSI and Government.
- Regulatory Landscape: Focus on data sovereignty and energy efficiency.

Taiwan Data Center Construction Market Industry Evolution
This section provides a detailed analysis of the Taiwan data center construction market's growth trajectory, technological advancements, and evolving consumer demands over the study period (2019-2033). We present specific data points, including growth rates and adoption metrics for various technologies. The market has experienced significant growth fueled by the increasing digitalization across various sectors. Advancements in technologies like AI, IoT, and 5G have further accelerated demand. The shift towards cloud computing and edge computing is reshaping the market, driving the need for more sophisticated and resilient data center infrastructure. The compound annual growth rate (CAGR) for the period 2025-2033 is estimated to be xx%. Adoption of green technologies, such as renewable energy sources in data center operations, is also gaining traction.
Leading Regions, Countries, or Segments in Taiwan Data Center Construction Market
This section identifies the dominant regions, countries, or segments within the Taiwan data center construction market, analyzing their growth drivers and dominance factors. The analysis is split across infrastructure types (Electrical, Mechanical, Other) and end-users (IT & Telecommunication, BFSI, Government, Healthcare, Other).
By Infrastructure:
- Electrical Infrastructure: Dominant due to high power consumption requirements of data centers.
- Key Drivers: Growing demand for power-efficient solutions, stringent energy regulations.
- Mechanical Infrastructure: Significant growth driven by the need for effective cooling and climate control.
- Key Drivers: Increasing data center densities, advancements in cooling technologies.
- Other Infrastructure: Steady growth, driven by demand for security and connectivity solutions.
By End User:
- IT & Telecommunication: Largest segment, owing to the sector's heavy reliance on data centers.
- Key Drivers: High investments in digital infrastructure, expansion of cloud services.
- BFSI: Significant growth driven by increasing demand for secure data storage and processing.
- Key Drivers: Regulations around data security, growing digital banking adoption.
- Government: Steady growth driven by government initiatives to enhance digital infrastructure.
- Key Drivers: e-governance initiatives, national security concerns.
Taiwan Data Center Construction Market Product Innovations
The Taiwan data center construction market is witnessing rapid product innovation, focusing on increasing efficiency, improving reliability, and enhancing sustainability. New solutions include modular data center designs for faster deployment, advanced cooling technologies for reduced energy consumption, and AI-powered monitoring systems for predictive maintenance. These innovations are enhancing the overall performance and operational efficiency of data centers, offering significant cost savings and reduced environmental impact. The unique selling propositions focus on reducing energy footprints and improving uptime.
Propelling Factors for Taiwan Data Center Construction Market Growth
Several factors are driving growth in the Taiwan data center construction market. These include the increasing adoption of cloud computing and big data analytics, government initiatives promoting digitalization, and strong investments from both domestic and international players. Furthermore, the growing demand for high-speed internet connectivity and the rise of 5G networks are contributing to the expansion of data center infrastructure. The robust growth of the IT and telecommunications sector significantly fuels this market’s expansion.
Obstacles in the Taiwan Data Center Construction Market
The Taiwan data center construction market faces several challenges, including the high cost of land and construction, potential regulatory hurdles related to energy consumption and data security, and the increasing complexity of data center infrastructure management. Supply chain disruptions and competition from established and emerging players pose additional challenges. These factors could potentially slow down market growth if not properly addressed. The impact of these challenges is estimated to reduce annual growth by approximately xx%.
Future Opportunities in Taiwan Data Center Construction Market
Future opportunities abound in the Taiwan data center construction market. The increasing adoption of edge computing presents a significant growth avenue. Furthermore, the demand for sustainable and energy-efficient data center solutions will continue to grow. Expansion into new geographic locations and the development of innovative technologies, like liquid cooling and AI-powered optimization, offer promising avenues for growth. The increasing demand for colocation services also presents substantial opportunities.
Major Players in the Taiwan Data Center Construction Market Ecosystem
- Space DC Pte Ltd
- Project Planning Service
- NTT Communications Corporation (NTT Communications)
- HITEC Power Protection
- Fujitsu Ltd (Fujitsu)
- GTN Data Center
- Schneider electric Philippines (Schneider Electric)
- Powerware Systems
- CRXCONE
- Biznet Networks
- PT Faasri Utama Sakti
- M+W Group (M+W Group)
- JLL (JLL)
- Legrand (Legrand)
- AVO Technology Sdn Bhd
- AECOM (AECOM)
- Indosat Tbk PT
Key Developments in Taiwan Data Center Construction Market Industry
- August 2022: Empyrion DC announces the construction of a new 40 MW data center (TP1) in Taipei, with completion expected between 2026-27. This signifies a substantial investment in Taiwan's data center capacity.
- August 2022: Chunghwa Telecom announces a new data center in Taoyuan with an IT load capacity exceeding 10 MW, spanning 225,000 sq. ft. Expected completion by the end of 2023. This demonstrates the commitment of Taiwanese companies to expanding domestic data center infrastructure.
Strategic Taiwan Data Center Construction Market Forecast
The Taiwan data center construction market is poised for robust growth over the forecast period (2025-2033), driven by increasing digitalization, technological advancements, and supportive government policies. The market's potential is significant, with opportunities arising from the expansion of cloud services, edge computing, and the rising demand for sustainable data center solutions. The market is expected to witness a substantial increase in investment and construction activity, further solidifying Taiwan's position as a key data center hub in Asia.
Taiwan Data Center Construction Market Segmentation
-
1. Infrastructure
-
1.1. By Electrical Infrastructure
-
1.1.1. Power Distribution Solution
- 1.1.1.1. PDU - Basic & Smart - Metered & Switched solutions
-
1.1.1.2. Transfer Switches
- 1.1.1.2.1. Static
- 1.1.1.2.2. Automatic (ATS)
-
1.1.1.3. Switchgear
- 1.1.1.3.1. Low-Voltage
- 1.1.1.3.2. Medium-Voltage
- 1.1.1.4. Power Panels and Components
- 1.1.1.5. Other Power Distribution Solutions
-
1.1.2. Power Backup Solutions
- 1.1.2.1. UPS
- 1.1.2.2. Generators
- 1.1.3. Service
-
1.1.1. Power Distribution Solution
-
1.2. By Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.2.1.1. Immersion Cooling
- 1.2.1.2. Direct-To-Chip Cooling
- 1.2.1.3. Rear Door Heat Exchanger
- 1.2.1.4. In-Row and In-Rack Cooling
- 1.2.2. Racks
- 1.2.3. Other Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.3. General Construction
-
1.1. By Electrical Infrastructure
-
2. Tier Type
- 2.1. Tier 1 and 2
- 2.2. Tier 3
- 2.3. Tier 4
-
3. End User
- 3.1. Banking, Financial Services, and Insurance
- 3.2. IT and Telecommunications
- 3.3. Government and Defense
- 3.4. Healthcare
- 3.5. Other End Users
Taiwan Data Center Construction Market Segmentation By Geography
- 1. Taiwan

Taiwan Data Center Construction Market REPORT HIGHLIGHTS
Aspects | Details |
---|---|
Study Period | 2019-2033 |
Base Year | 2024 |
Estimated Year | 2025 |
Forecast Period | 2025-2033 |
Historical Period | 2019-2024 |
Growth Rate | CAGR of 7.03% from 2019-2033 |
Segmentation |
|
Table of Contents
- 1. Introduction
- 1.1. Research Scope
- 1.2. Market Segmentation
- 1.3. Research Methodology
- 1.4. Definitions and Assumptions
- 2. Executive Summary
- 2.1. Introduction
- 3. Market Dynamics
- 3.1. Introduction
- 3.2. Market Drivers
- 3.2.1. 9.1 Increased Internet Penetration9.2 Established 'Mobile-First' Landscape Since the Recent Past
- 3.3. Market Restrains
- 3.3.1. 10.1 Shortage of Skilled Professionals Presenting a Challenge for Several Contractors
- 3.4. Market Trends
- 3.4.1. Taipei is Expected to Remain Major Data Center Hotspot in Taiwan
- 4. Market Factor Analysis
- 4.1. Porters Five Forces
- 4.2. Supply/Value Chain
- 4.3. PESTEL analysis
- 4.4. Market Entropy
- 4.5. Patent/Trademark Analysis
- 5. Taiwan Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 5.1.1. By Electrical Infrastructure
- 5.1.1.1. Power Distribution Solution
- 5.1.1.1.1. PDU - Basic & Smart - Metered & Switched solutions
- 5.1.1.1.2. Transfer Switches
- 5.1.1.1.2.1. Static
- 5.1.1.1.2.2. Automatic (ATS)
- 5.1.1.1.3. Switchgear
- 5.1.1.1.3.1. Low-Voltage
- 5.1.1.1.3.2. Medium-Voltage
- 5.1.1.1.4. Power Panels and Components
- 5.1.1.1.5. Other Power Distribution Solutions
- 5.1.1.2. Power Backup Solutions
- 5.1.1.2.1. UPS
- 5.1.1.2.2. Generators
- 5.1.1.3. Service
- 5.1.1.1. Power Distribution Solution
- 5.1.2. By Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.2.1.1. Immersion Cooling
- 5.1.2.1.2. Direct-To-Chip Cooling
- 5.1.2.1.3. Rear Door Heat Exchanger
- 5.1.2.1.4. In-Row and In-Rack Cooling
- 5.1.2.2. Racks
- 5.1.2.3. Other Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.3. General Construction
- 5.1.1. By Electrical Infrastructure
- 5.2. Market Analysis, Insights and Forecast - by Tier Type
- 5.2.1. Tier 1 and 2
- 5.2.2. Tier 3
- 5.2.3. Tier 4
- 5.3. Market Analysis, Insights and Forecast - by End User
- 5.3.1. Banking, Financial Services, and Insurance
- 5.3.2. IT and Telecommunications
- 5.3.3. Government and Defense
- 5.3.4. Healthcare
- 5.3.5. Other End Users
- 5.4. Market Analysis, Insights and Forecast - by Region
- 5.4.1. Taiwan
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 6. Competitive Analysis
- 6.1. Market Share Analysis 2024
- 6.2. Company Profiles
- 6.2.1 Space DC Pte Ltd
- 6.2.1.1. Overview
- 6.2.1.2. Products
- 6.2.1.3. SWOT Analysis
- 6.2.1.4. Recent Developments
- 6.2.1.5. Financials (Based on Availability)
- 6.2.2 Project Planning Service
- 6.2.2.1. Overview
- 6.2.2.2. Products
- 6.2.2.3. SWOT Analysis
- 6.2.2.4. Recent Developments
- 6.2.2.5. Financials (Based on Availability)
- 6.2.3 NTT Communications Corporation
- 6.2.3.1. Overview
- 6.2.3.2. Products
- 6.2.3.3. SWOT Analysis
- 6.2.3.4. Recent Developments
- 6.2.3.5. Financials (Based on Availability)
- 6.2.4 HITEC Power Protection
- 6.2.4.1. Overview
- 6.2.4.2. Products
- 6.2.4.3. SWOT Analysis
- 6.2.4.4. Recent Developments
- 6.2.4.5. Financials (Based on Availability)
- 6.2.5 Fujitsu Ltd
- 6.2.5.1. Overview
- 6.2.5.2. Products
- 6.2.5.3. SWOT Analysis
- 6.2.5.4. Recent Developments
- 6.2.5.5. Financials (Based on Availability)
- 6.2.6 GTN Data Center
- 6.2.6.1. Overview
- 6.2.6.2. Products
- 6.2.6.3. SWOT Analysis
- 6.2.6.4. Recent Developments
- 6.2.6.5. Financials (Based on Availability)
- 6.2.7 Schneider electric Philippines
- 6.2.7.1. Overview
- 6.2.7.2. Products
- 6.2.7.3. SWOT Analysis
- 6.2.7.4. Recent Developments
- 6.2.7.5. Financials (Based on Availability)
- 6.2.8 Powerware Systems
- 6.2.8.1. Overview
- 6.2.8.2. Products
- 6.2.8.3. SWOT Analysis
- 6.2.8.4. Recent Developments
- 6.2.8.5. Financials (Based on Availability)
- 6.2.9 CRXCONE
- 6.2.9.1. Overview
- 6.2.9.2. Products
- 6.2.9.3. SWOT Analysis
- 6.2.9.4. Recent Developments
- 6.2.9.5. Financials (Based on Availability)
- 6.2.10 Biznet Networks
- 6.2.10.1. Overview
- 6.2.10.2. Products
- 6.2.10.3. SWOT Analysis
- 6.2.10.4. Recent Developments
- 6.2.10.5. Financials (Based on Availability)
- 6.2.11 PT Faasri Utama Sakti
- 6.2.11.1. Overview
- 6.2.11.2. Products
- 6.2.11.3. SWOT Analysis
- 6.2.11.4. Recent Developments
- 6.2.11.5. Financials (Based on Availability)
- 6.2.12 M+W Group
- 6.2.12.1. Overview
- 6.2.12.2. Products
- 6.2.12.3. SWOT Analysis
- 6.2.12.4. Recent Developments
- 6.2.12.5. Financials (Based on Availability)
- 6.2.13 JLL
- 6.2.13.1. Overview
- 6.2.13.2. Products
- 6.2.13.3. SWOT Analysis
- 6.2.13.4. Recent Developments
- 6.2.13.5. Financials (Based on Availability)
- 6.2.14 Legrand
- 6.2.14.1. Overview
- 6.2.14.2. Products
- 6.2.14.3. SWOT Analysis
- 6.2.14.4. Recent Developments
- 6.2.14.5. Financials (Based on Availability)
- 6.2.15 AVO Technology Sdn Bhd
- 6.2.15.1. Overview
- 6.2.15.2. Products
- 6.2.15.3. SWOT Analysis
- 6.2.15.4. Recent Developments
- 6.2.15.5. Financials (Based on Availability)
- 6.2.16 AECOM
- 6.2.16.1. Overview
- 6.2.16.2. Products
- 6.2.16.3. SWOT Analysis
- 6.2.16.4. Recent Developments
- 6.2.16.5. Financials (Based on Availability)
- 6.2.17 Indosat Tbk PT
- 6.2.17.1. Overview
- 6.2.17.2. Products
- 6.2.17.3. SWOT Analysis
- 6.2.17.4. Recent Developments
- 6.2.17.5. Financials (Based on Availability)
- 6.2.1 Space DC Pte Ltd
List of Figures
- Figure 1: Taiwan Data Center Construction Market Revenue Breakdown (Million, %) by Product 2024 & 2032
- Figure 2: Taiwan Data Center Construction Market Share (%) by Company 2024
List of Tables
- Table 1: Taiwan Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 2: Taiwan Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 3: Taiwan Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 4: Taiwan Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 5: Taiwan Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 6: Taiwan Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 7: Taiwan Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 8: Taiwan Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 9: Taiwan Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 10: Taiwan Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
Frequently Asked Questions
1. What is the projected Compound Annual Growth Rate (CAGR) of the Taiwan Data Center Construction Market?
The projected CAGR is approximately 7.03%.
2. Which companies are prominent players in the Taiwan Data Center Construction Market?
Key companies in the market include Space DC Pte Ltd, Project Planning Service, NTT Communications Corporation, HITEC Power Protection, Fujitsu Ltd, GTN Data Center, Schneider electric Philippines, Powerware Systems, CRXCONE, Biznet Networks, PT Faasri Utama Sakti, M+W Group, JLL, Legrand, AVO Technology Sdn Bhd, AECOM, Indosat Tbk PT.
3. What are the main segments of the Taiwan Data Center Construction Market?
The market segments include Infrastructure, Tier Type, End User.
4. Can you provide details about the market size?
The market size is estimated to be USD XX Million as of 2022.
5. What are some drivers contributing to market growth?
9.1 Increased Internet Penetration9.2 Established 'Mobile-First' Landscape Since the Recent Past.
6. What are the notable trends driving market growth?
Taipei is Expected to Remain Major Data Center Hotspot in Taiwan.
7. Are there any restraints impacting market growth?
10.1 Shortage of Skilled Professionals Presenting a Challenge for Several Contractors.
8. Can you provide examples of recent developments in the market?
August 2022: Empyrion DC, a Singapore based DC operator, has announced construction of new data center in Taipei, named as TP1. The facility is expected to have an IT load capacity of 40 MW upon completion and the project is expected to begin in 2023-24 and is anticipated to be completed by 2026-27.
9. What pricing options are available for accessing the report?
Pricing options include single-user, multi-user, and enterprise licenses priced at USD 3800, USD 4500, and USD 5800 respectively.
10. Is the market size provided in terms of value or volume?
The market size is provided in terms of value, measured in Million.
11. Are there any specific market keywords associated with the report?
Yes, the market keyword associated with the report is "Taiwan Data Center Construction Market," which aids in identifying and referencing the specific market segment covered.
12. How do I determine which pricing option suits my needs best?
The pricing options vary based on user requirements and access needs. Individual users may opt for single-user licenses, while businesses requiring broader access may choose multi-user or enterprise licenses for cost-effective access to the report.
13. Are there any additional resources or data provided in the Taiwan Data Center Construction Market report?
While the report offers comprehensive insights, it's advisable to review the specific contents or supplementary materials provided to ascertain if additional resources or data are available.
14. How can I stay updated on further developments or reports in the Taiwan Data Center Construction Market?
To stay informed about further developments, trends, and reports in the Taiwan Data Center Construction Market, consider subscribing to industry newsletters, following relevant companies and organizations, or regularly checking reputable industry news sources and publications.
Methodology
Step 1 - Identification of Relevant Samples Size from Population Database



Step 2 - Approaches for Defining Global Market Size (Value, Volume* & Price*)

Note*: In applicable scenarios
Step 3 - Data Sources
Primary Research
- Web Analytics
- Survey Reports
- Research Institute
- Latest Research Reports
- Opinion Leaders
Secondary Research
- Annual Reports
- White Paper
- Latest Press Release
- Industry Association
- Paid Database
- Investor Presentations

Step 4 - Data Triangulation
Involves using different sources of information in order to increase the validity of a study
These sources are likely to be stakeholders in a program - participants, other researchers, program staff, other community members, and so on.
Then we put all data in single framework & apply various statistical tools to find out the dynamic on the market.
During the analysis stage, feedback from the stakeholder groups would be compared to determine areas of agreement as well as areas of divergence