Key Insights
The Middle East data center construction market is experiencing robust growth, projected to reach a substantial size by 2033, driven by a 14.74% Compound Annual Growth Rate (CAGR) from 2025 to 2033. This expansion is fueled by several key factors. The rapid digital transformation across various sectors, including IT & Telecommunications, BFSI (Banking, Financial Services, and Insurance), and government initiatives promoting digital economies, are significantly increasing demand for advanced data center infrastructure. The region's burgeoning e-commerce sector and increasing adoption of cloud computing services are further bolstering market growth. Furthermore, the strategic geographical location of the Middle East, acting as a crucial hub connecting Asia, Africa, and Europe, makes it an attractive location for global hyperscale data center operators. Investment in robust power infrastructure, including power distribution units (PDUs) and efficient cooling solutions (such as evaporative cooling), is also contributing to this growth. The market is segmented by tier type (Tier 1-4), data center size (small to massive), infrastructure components (cooling, power, security, etc.), and end-user industry. The competitive landscape is characterized by a mix of international players and regional contractors, indicating a dynamic and evolving market environment.
Significant challenges remain, however. High construction costs, particularly for specialized infrastructure in certain regions, and the need for skilled labor can hinder market expansion. Furthermore, regulatory complexities and potential power grid limitations in some areas could pose obstacles to consistent growth. Nevertheless, the long-term outlook remains positive, with continued investment in digital infrastructure and the ongoing digital transformation across various sectors expected to drive further expansion of the Middle East data center construction market throughout the forecast period. The market is likely to see increased focus on sustainable and energy-efficient data center designs in response to growing environmental concerns.
Middle East Data Center Construction Market: A Comprehensive Report (2019-2033)
This in-depth report provides a comprehensive analysis of the Middle East data center construction market, offering valuable insights into market trends, leading players, and future growth opportunities. Covering the period from 2019 to 2033, with a focus on 2025, this report is an essential resource for stakeholders seeking to understand and capitalize on this rapidly expanding sector. The report encompasses detailed segmentation across Tier types (Tier 1, Tier 2, Tier 3, Tier 4), data center size (Small, Medium, Large, Mega, Massive), infrastructure components (Cooling, Power, Racks & Cabinets, Security, Design & Consulting, etc.), and end-users (IT & Telecom, BFSI, Government, Healthcare, and Others).

Middle East Data Center Construction Market Composition & Trends
The Middle East data center construction market is experiencing significant growth, driven by increasing digitalization, cloud adoption, and government initiatives. Market concentration is moderate, with a few major players holding significant shares, while numerous regional and specialized firms contribute to the overall landscape. Innovation is fueled by the demand for higher efficiency, greater scalability, and enhanced security in data center infrastructure. The regulatory landscape, while evolving, is generally supportive of data center development, with varying regulations across different countries within the region. Substitute products are limited, but improvements in alternative technologies like edge computing could influence market dynamics. M&A activity is relatively high, with strategic acquisitions driving consolidation and expansion.
- Market Share Distribution (2024 Estimate): Top 5 players hold approximately xx% of the market share. Remaining share is distributed across numerous smaller firms.
- M&A Deal Values (2019-2024): Total deal value estimated at $xx Million, with an average deal size of $xx Million. A significant portion of deals involved acquisitions of specialized firms by larger players.
- Key End-User Segments: IT & Telecommunication, BFSI, and Government sectors are the largest contributors to market demand, representing xx% of the total market in 2024.

Middle East Data Center Construction Market Industry Evolution
The Middle East data center construction market has demonstrated robust growth over the historical period (2019-2024), with a Compound Annual Growth Rate (CAGR) of xx%. This growth trajectory is projected to continue during the forecast period (2025-2033), albeit at a slightly moderated pace, reaching a CAGR of xx%. Technological advancements, such as the adoption of AI-powered cooling systems, modular data centers, and increased use of renewable energy sources, are major drivers of this evolution. Consumer demand is increasingly focused on higher sustainability, resilience, and cost-effectiveness, influencing the design and construction of data centers. The shift towards hyperscale data centers is also impacting market dynamics, favoring larger construction projects and specialized expertise. Further growth is fueled by the increased focus on digital transformation initiatives across various industry verticals, creating a greater need for robust and scalable data center infrastructure. The demand for colocation facilities and cloud services is expected to propel market growth, especially in regions with favorable regulatory environments and government support.
Leading Regions, Countries, or Segments in Middle East Data Center Construction Market
The UAE and Saudi Arabia are currently the leading markets in the Middle East data center construction sector, attracting substantial investments due to supportive government policies, established digital infrastructure, and significant growth in the IT sector. Within the segments, large and mega data centers are experiencing the most rapid growth, owing to the increasing requirements of hyperscale cloud providers and large enterprises. Similarly, the cooling infrastructure segment represents a significant share of the market, driving demand for energy-efficient and advanced cooling technologies.
- Key Drivers for UAE & Saudi Arabia Dominance:
- Significant government investments in digital infrastructure.
- Favourable regulatory frameworks promoting foreign investment.
- High concentration of major IT and financial institutions.
- Strong growth in cloud adoption and e-commerce.
- Other Significant Segments: The BFSI and Government sectors show strong growth, driven by increasing digitalization and cybersecurity concerns. Power infrastructure, including Power Distribution Units (PDUs), is another critical growth segment.
Middle East Data Center Construction Market Product Innovations
Recent innovations include prefabricated modular data centers, which offer faster deployment, cost savings, and improved scalability. Advances in liquid cooling technology provide significantly improved energy efficiency, reducing operational costs and environmental impact. AI-powered predictive maintenance solutions optimize resource allocation and minimize downtime. These innovations are driven by the need for greater efficiency, sustainability, and resilience in data center operations. Furthermore, the integration of renewable energy sources and robust security systems is shaping the future of data center design and construction.
Propelling Factors for Middle East Data Center Construction Market Growth
The market's growth is propelled by several factors, including: the burgeoning digital economy and increasing cloud adoption; government initiatives to boost digital infrastructure; rising demand for colocation services; and significant investments from both domestic and international players. The growth of e-commerce and the increasing adoption of big data analytics also significantly influence market demand. The regulatory support for data localization initiatives further accelerates growth by creating a demand for more data centers within the region.
Obstacles in the Middle East Data Center Construction Market
Challenges include: potential supply chain disruptions impacting construction timelines and costs; fluctuating energy prices affecting operational expenses; and competition from established international players. Regulatory inconsistencies across different countries in the region can also create hurdles for businesses. Furthermore, the high cost of land and skilled labor can contribute to increased project expenses, potentially hindering growth. The dependence on imported components and equipment also poses a vulnerability to global supply chain disruptions.
Future Opportunities in Middle East Data Center Construction Market
Future opportunities lie in: expanding into less-developed markets within the Middle East; leveraging emerging technologies like edge computing and AI; and focusing on sustainable and energy-efficient data center designs. The growing adoption of 5G networks and the increasing demand for IoT devices will further drive demand. Companies focusing on providing innovative and sustainable solutions will benefit most. Furthermore, expanding into new markets within the region, such as Oman and Jordan, presents significant potential for growth.
Major Players in the Middle East Data Center Construction Market Ecosystem
- Canovate S A
- ABB Ltd (ABB Ltd)
- Johnson Controls International PLC (Johnson Controls International PLC)
- Fortis Construction
- STULZ GMBH (STULZ GMBH)
- Delta Group (Delta Group)
- Schneider Electric SE (Schneider Electric SE)
- Turner Construction Co (Turner Construction Co)
- DPR Construction Inc (DPR Construction Inc)
- Caterpillar Inc (Caterpillar Inc)
- Airedale International Air Conditioning Ltd (Airedale International Air Conditioning Ltd)
- Cummins Inc (Cummins Inc)
- AECOM Limited (AECOM Limited)
- Legrand (Legrand)
- CyrusOne Inc (CyrusOne Inc)
- Future Digital data Systems
- Ashi & Bushnag Co Ltd
- EAE Group
- Alfa Laval AB (Alfa Laval AB)
- Saan Zahav Ltd
Key Developments in Middle East Data Center Construction Market Industry
- October 2022: Launch of M-VAULT 4's fourth data center building in Qatar by Minister Mohamed bin Ali bin Mohamed Al-Mannai, expanding cloud services access through Microsoft Cloud.
- October 2022: Khazna Data Centers, Masdar, and EDF partnered to build a solar PV plant powering a new data center in Masdar City, highlighting the growing focus on sustainable energy solutions in the region.
Strategic Middle East Data Center Construction Market Forecast
The Middle East data center construction market is poised for sustained growth, driven by continuous digital transformation across various sectors, increased government support for digital infrastructure development, and the growing adoption of cloud-based services. The market is expected to witness significant expansion in the coming years, particularly in high-growth segments such as hyperscale data centers and sustainable infrastructure solutions. This positive outlook is further reinforced by ongoing investments from both regional and international players, creating lucrative opportunities for businesses operating in this dynamic market.
Middle East Data Center Construction Market Segmentation
-
1. Infrastructure
-
1.1. Market Segmentation - By Electrical Infrastructure
-
1.1.1. Power Distribution Solution
- 1.1.1.1. PDU - Basic & Smart - Metered & Switched Solutions
-
1.1.1.2. Transfer Switches
- 1.1.1.2.1. Static
- 1.1.1.2.2. Automatic (ATS)
-
1.1.1.3. Switchgear
- 1.1.1.3.1. Low-Voltage
- 1.1.1.3.2. Medium-Voltage
- 1.1.1.4. Power Panels and Components
- 1.1.1.5. Other Power Distribution Solutions
-
1.1.2. Power Backup Solutions
- 1.1.2.1. UPS
- 1.1.2.2. Generators
- 1.1.3. Service
-
1.1.1. Power Distribution Solution
-
1.2. Market Segmentation - By Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.2.1.1. Immersion Cooling
- 1.2.1.2. Direct-To-Chip Cooling
- 1.2.1.3. Rear Door Heat Exchanger
- 1.2.1.4. In-Row and In-Rack Cooling
- 1.2.2. Racks
- 1.2.3. Other Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.3. General Construction
-
1.1. Market Segmentation - By Electrical Infrastructure
-
2. Electrical Infrastructure
-
2.1. Power Distribution Solution
- 2.1.1. PDU - Basic & Smart - Metered & Switched Solutions
-
2.1.2. Transfer Switches
- 2.1.2.1. Static
- 2.1.2.2. Automatic (ATS)
-
2.1.3. Switchgear
- 2.1.3.1. Low-Voltage
- 2.1.3.2. Medium-Voltage
- 2.1.4. Power Panels and Components
- 2.1.5. Other Power Distribution Solutions
-
2.2. Power Backup Solutions
- 2.2.1. UPS
- 2.2.2. Generators
- 2.3. Service
-
2.1. Power Distribution Solution
-
3. Power Distribution Solution
- 3.1. PDU - Basic & Smart - Metered & Switched Solutions
-
3.2. Transfer Switches
- 3.2.1. Static
- 3.2.2. Automatic (ATS)
-
3.3. Switchgear
- 3.3.1. Low-Voltage
- 3.3.2. Medium-Voltage
- 3.4. Power Panels and Components
- 3.5. Other Power Distribution Solutions
-
4. Power Backup Solutions
- 4.1. UPS
- 4.2. Generators
- 5. Service
-
6. Mechanical Infrastructure
-
6.1. Cooling Systems
- 6.1.1. Immersion Cooling
- 6.1.2. Direct-To-Chip Cooling
- 6.1.3. Rear Door Heat Exchanger
- 6.1.4. In-Row and In-Rack Cooling
- 6.2. Racks
- 6.3. Other Mechanical Infrastructure
-
6.1. Cooling Systems
-
7. Cooling Systems
- 7.1. Immersion Cooling
- 7.2. Direct-To-Chip Cooling
- 7.3. Rear Door Heat Exchanger
- 7.4. In-Row and In-Rack Cooling
- 8. Racks
- 9. Other Mechanical Infrastructure
- 10. General Construction
-
11. Tier Type
- 11.1. Tier 1 and 2
- 11.2. Tier 3
- 11.3. Tier 4
- 12. Tier 1 and 2
- 13. Tier 3
- 14. Tier 4
-
15. End User
- 15.1. Banking, Financial Services, and Insurance
- 15.2. IT and Telecommunications
- 15.3. Government and Defense
- 15.4. Healthcare
- 15.5. Other End Users
- 16. Banking, Financial Services, and Insurance
- 17. IT and Telecommunications
- 18. Government and Defense
- 19. Healthcare
- 20. Other End Users
- 21. United Arab Emirates
- 22. Saudi Arabia
- 23. Israel
- 24. Qatar
- 25. Oman
Middle East Data Center Construction Market Segmentation By Geography
-
1. Middle East
- 1.1. Saudi Arabia
- 1.2. United Arab Emirates
- 1.3. Israel
- 1.4. Qatar
- 1.5. Kuwait
- 1.6. Oman
- 1.7. Bahrain
- 1.8. Jordan
- 1.9. Lebanon

Middle East Data Center Construction Market REPORT HIGHLIGHTS
Aspects | Details |
---|---|
Study Period | 2019-2033 |
Base Year | 2024 |
Estimated Year | 2025 |
Forecast Period | 2025-2033 |
Historical Period | 2019-2024 |
Growth Rate | CAGR of 14.74% from 2019-2033 |
Segmentation |
|
Table of Contents
- 1. Introduction
- 1.1. Research Scope
- 1.2. Market Segmentation
- 1.3. Research Methodology
- 1.4. Definitions and Assumptions
- 2. Executive Summary
- 2.1. Introduction
- 3. Market Dynamics
- 3.1. Introduction
- 3.2. Market Drivers
- 3.2.1. Rising Adoption of Renewable Energy Sources; Increase in 5G Deployments Fueling Edge Data Center Investments; Smart City Initiatives Driving Data Center Investments
- 3.3. Market Restrains
- 3.3.1. Security Challenges in Data Centers; Location Constraints on the Development of Data Centers
- 3.4. Market Trends
- 3.4.1. End-User Outlook
- 4. Market Factor Analysis
- 4.1. Porters Five Forces
- 4.2. Supply/Value Chain
- 4.3. PESTEL analysis
- 4.4. Market Entropy
- 4.5. Patent/Trademark Analysis
- 5. Middle East Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.1.1.1. Power Distribution Solution
- 5.1.1.1.1. PDU - Basic & Smart - Metered & Switched Solutions
- 5.1.1.1.2. Transfer Switches
- 5.1.1.1.2.1. Static
- 5.1.1.1.2.2. Automatic (ATS)
- 5.1.1.1.3. Switchgear
- 5.1.1.1.3.1. Low-Voltage
- 5.1.1.1.3.2. Medium-Voltage
- 5.1.1.1.4. Power Panels and Components
- 5.1.1.1.5. Other Power Distribution Solutions
- 5.1.1.2. Power Backup Solutions
- 5.1.1.2.1. UPS
- 5.1.1.2.2. Generators
- 5.1.1.3. Service
- 5.1.1.1. Power Distribution Solution
- 5.1.2. Market Segmentation - By Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.2.1.1. Immersion Cooling
- 5.1.2.1.2. Direct-To-Chip Cooling
- 5.1.2.1.3. Rear Door Heat Exchanger
- 5.1.2.1.4. In-Row and In-Rack Cooling
- 5.1.2.2. Racks
- 5.1.2.3. Other Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.3. General Construction
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 5.2.1. Power Distribution Solution
- 5.2.1.1. PDU - Basic & Smart - Metered & Switched Solutions
- 5.2.1.2. Transfer Switches
- 5.2.1.2.1. Static
- 5.2.1.2.2. Automatic (ATS)
- 5.2.1.3. Switchgear
- 5.2.1.3.1. Low-Voltage
- 5.2.1.3.2. Medium-Voltage
- 5.2.1.4. Power Panels and Components
- 5.2.1.5. Other Power Distribution Solutions
- 5.2.2. Power Backup Solutions
- 5.2.2.1. UPS
- 5.2.2.2. Generators
- 5.2.3. Service
- 5.2.1. Power Distribution Solution
- 5.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 5.3.1. PDU - Basic & Smart - Metered & Switched Solutions
- 5.3.2. Transfer Switches
- 5.3.2.1. Static
- 5.3.2.2. Automatic (ATS)
- 5.3.3. Switchgear
- 5.3.3.1. Low-Voltage
- 5.3.3.2. Medium-Voltage
- 5.3.4. Power Panels and Components
- 5.3.5. Other Power Distribution Solutions
- 5.4. Market Analysis, Insights and Forecast - by Power Backup Solutions
- 5.4.1. UPS
- 5.4.2. Generators
- 5.5. Market Analysis, Insights and Forecast - by Service
- 5.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.6.1.1. Immersion Cooling
- 5.6.1.2. Direct-To-Chip Cooling
- 5.6.1.3. Rear Door Heat Exchanger
- 5.6.1.4. In-Row and In-Rack Cooling
- 5.6.2. Racks
- 5.6.3. Other Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 5.7.1. Immersion Cooling
- 5.7.2. Direct-To-Chip Cooling
- 5.7.3. Rear Door Heat Exchanger
- 5.7.4. In-Row and In-Rack Cooling
- 5.8. Market Analysis, Insights and Forecast - by Racks
- 5.9. Market Analysis, Insights and Forecast - by Other Mechanical Infrastructure
- 5.10. Market Analysis, Insights and Forecast - by General Construction
- 5.11. Market Analysis, Insights and Forecast - by Tier Type
- 5.11.1. Tier 1 and 2
- 5.11.2. Tier 3
- 5.11.3. Tier 4
- 5.12. Market Analysis, Insights and Forecast - by Tier 1 and 2
- 5.13. Market Analysis, Insights and Forecast - by Tier 3
- 5.14. Market Analysis, Insights and Forecast - by Tier 4
- 5.15. Market Analysis, Insights and Forecast - by End User
- 5.15.1. Banking, Financial Services, and Insurance
- 5.15.2. IT and Telecommunications
- 5.15.3. Government and Defense
- 5.15.4. Healthcare
- 5.15.5. Other End Users
- 5.16. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 5.17. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 5.18. Market Analysis, Insights and Forecast - by Government and Defense
- 5.19. Market Analysis, Insights and Forecast - by Healthcare
- 5.20. Market Analysis, Insights and Forecast - by Other End Users
- 5.21. Market Analysis, Insights and Forecast - by United Arab Emirates
- 5.22. Market Analysis, Insights and Forecast - by Saudi Arabia
- 5.23. Market Analysis, Insights and Forecast - by Israel
- 5.24. Market Analysis, Insights and Forecast - by Qatar
- 5.25. Market Analysis, Insights and Forecast - by Oman
- 5.26. Market Analysis, Insights and Forecast - by Region
- 5.26.1. Middle East
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 6. United Arab Emirates Middle East Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 7. Saudi Arabia Middle East Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 8. Qatar Middle East Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 9. Israel Middle East Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 10. Egypt Middle East Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 11. Oman Middle East Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 12. Rest of Middle East Middle East Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 13. Competitive Analysis
- 13.1. Market Share Analysis 2024
- 13.2. Company Profiles
- 13.2.1 Canovate S A
- 13.2.1.1. Overview
- 13.2.1.2. Products
- 13.2.1.3. SWOT Analysis
- 13.2.1.4. Recent Developments
- 13.2.1.5. Financials (Based on Availability)
- 13.2.2 ABB Ltd
- 13.2.2.1. Overview
- 13.2.2.2. Products
- 13.2.2.3. SWOT Analysis
- 13.2.2.4. Recent Developments
- 13.2.2.5. Financials (Based on Availability)
- 13.2.3 Johnson Controls International PLC
- 13.2.3.1. Overview
- 13.2.3.2. Products
- 13.2.3.3. SWOT Analysis
- 13.2.3.4. Recent Developments
- 13.2.3.5. Financials (Based on Availability)
- 13.2.4 Fortis Construction
- 13.2.4.1. Overview
- 13.2.4.2. Products
- 13.2.4.3. SWOT Analysis
- 13.2.4.4. Recent Developments
- 13.2.4.5. Financials (Based on Availability)
- 13.2.5 STULZ GMBH
- 13.2.5.1. Overview
- 13.2.5.2. Products
- 13.2.5.3. SWOT Analysis
- 13.2.5.4. Recent Developments
- 13.2.5.5. Financials (Based on Availability)
- 13.2.6 Delta Group
- 13.2.6.1. Overview
- 13.2.6.2. Products
- 13.2.6.3. SWOT Analysis
- 13.2.6.4. Recent Developments
- 13.2.6.5. Financials (Based on Availability)
- 13.2.7 Schneider Electric SE
- 13.2.7.1. Overview
- 13.2.7.2. Products
- 13.2.7.3. SWOT Analysis
- 13.2.7.4. Recent Developments
- 13.2.7.5. Financials (Based on Availability)
- 13.2.8 Turner Construction Co
- 13.2.8.1. Overview
- 13.2.8.2. Products
- 13.2.8.3. SWOT Analysis
- 13.2.8.4. Recent Developments
- 13.2.8.5. Financials (Based on Availability)
- 13.2.9 DPR Construction Inc
- 13.2.9.1. Overview
- 13.2.9.2. Products
- 13.2.9.3. SWOT Analysis
- 13.2.9.4. Recent Developments
- 13.2.9.5. Financials (Based on Availability)
- 13.2.10 Caterpillar Inc
- 13.2.10.1. Overview
- 13.2.10.2. Products
- 13.2.10.3. SWOT Analysis
- 13.2.10.4. Recent Developments
- 13.2.10.5. Financials (Based on Availability)
- 13.2.11 Airedale International Air Conditioning Ltd
- 13.2.11.1. Overview
- 13.2.11.2. Products
- 13.2.11.3. SWOT Analysis
- 13.2.11.4. Recent Developments
- 13.2.11.5. Financials (Based on Availability)
- 13.2.12 Cummins Inc
- 13.2.12.1. Overview
- 13.2.12.2. Products
- 13.2.12.3. SWOT Analysis
- 13.2.12.4. Recent Developments
- 13.2.12.5. Financials (Based on Availability)
- 13.2.13 AECOM Limited
- 13.2.13.1. Overview
- 13.2.13.2. Products
- 13.2.13.3. SWOT Analysis
- 13.2.13.4. Recent Developments
- 13.2.13.5. Financials (Based on Availability)
- 13.2.14 Legrand
- 13.2.14.1. Overview
- 13.2.14.2. Products
- 13.2.14.3. SWOT Analysis
- 13.2.14.4. Recent Developments
- 13.2.14.5. Financials (Based on Availability)
- 13.2.15 CyrusOne Inc
- 13.2.15.1. Overview
- 13.2.15.2. Products
- 13.2.15.3. SWOT Analysis
- 13.2.15.4. Recent Developments
- 13.2.15.5. Financials (Based on Availability)
- 13.2.16 Future Digital data Systems
- 13.2.16.1. Overview
- 13.2.16.2. Products
- 13.2.16.3. SWOT Analysis
- 13.2.16.4. Recent Developments
- 13.2.16.5. Financials (Based on Availability)
- 13.2.17 Ashi & Bushnag Co Ltd
- 13.2.17.1. Overview
- 13.2.17.2. Products
- 13.2.17.3. SWOT Analysis
- 13.2.17.4. Recent Developments
- 13.2.17.5. Financials (Based on Availability)
- 13.2.18 EAE Group
- 13.2.18.1. Overview
- 13.2.18.2. Products
- 13.2.18.3. SWOT Analysis
- 13.2.18.4. Recent Developments
- 13.2.18.5. Financials (Based on Availability)
- 13.2.19 Alfa Laval AB
- 13.2.19.1. Overview
- 13.2.19.2. Products
- 13.2.19.3. SWOT Analysis
- 13.2.19.4. Recent Developments
- 13.2.19.5. Financials (Based on Availability)
- 13.2.20 Saan Zahav Ltd
- 13.2.20.1. Overview
- 13.2.20.2. Products
- 13.2.20.3. SWOT Analysis
- 13.2.20.4. Recent Developments
- 13.2.20.5. Financials (Based on Availability)
- 13.2.1 Canovate S A
List of Figures
- Figure 1: Middle East Data Center Construction Market Revenue Breakdown (Million, %) by Product 2024 & 2032
- Figure 2: Middle East Data Center Construction Market Share (%) by Company 2024
List of Tables
- Table 1: Middle East Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 2: Middle East Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 3: Middle East Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 4: Middle East Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 5: Middle East Data Center Construction Market Revenue Million Forecast, by Power Backup Solutions 2019 & 2032
- Table 6: Middle East Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 7: Middle East Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 8: Middle East Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 9: Middle East Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 10: Middle East Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 11: Middle East Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 12: Middle East Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 13: Middle East Data Center Construction Market Revenue Million Forecast, by Tier 1 and 2 2019 & 2032
- Table 14: Middle East Data Center Construction Market Revenue Million Forecast, by Tier 3 2019 & 2032
- Table 15: Middle East Data Center Construction Market Revenue Million Forecast, by Tier 4 2019 & 2032
- Table 16: Middle East Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 17: Middle East Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 18: Middle East Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 19: Middle East Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 20: Middle East Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 21: Middle East Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 22: Middle East Data Center Construction Market Revenue Million Forecast, by United Arab Emirates 2019 & 2032
- Table 23: Middle East Data Center Construction Market Revenue Million Forecast, by Saudi Arabia 2019 & 2032
- Table 24: Middle East Data Center Construction Market Revenue Million Forecast, by Israel 2019 & 2032
- Table 25: Middle East Data Center Construction Market Revenue Million Forecast, by Qatar 2019 & 2032
- Table 26: Middle East Data Center Construction Market Revenue Million Forecast, by Oman 2019 & 2032
- Table 27: Middle East Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 28: Middle East Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 29: United Arab Emirates Middle East Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 30: Saudi Arabia Middle East Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 31: Qatar Middle East Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 32: Israel Middle East Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 33: Egypt Middle East Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 34: Oman Middle East Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 35: Rest of Middle East Middle East Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 36: Middle East Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 37: Middle East Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 38: Middle East Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 39: Middle East Data Center Construction Market Revenue Million Forecast, by Power Backup Solutions 2019 & 2032
- Table 40: Middle East Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 41: Middle East Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 42: Middle East Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 43: Middle East Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 44: Middle East Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 45: Middle East Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 46: Middle East Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 47: Middle East Data Center Construction Market Revenue Million Forecast, by Tier 1 and 2 2019 & 2032
- Table 48: Middle East Data Center Construction Market Revenue Million Forecast, by Tier 3 2019 & 2032
- Table 49: Middle East Data Center Construction Market Revenue Million Forecast, by Tier 4 2019 & 2032
- Table 50: Middle East Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 51: Middle East Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 52: Middle East Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 53: Middle East Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 54: Middle East Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 55: Middle East Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 56: Middle East Data Center Construction Market Revenue Million Forecast, by United Arab Emirates 2019 & 2032
- Table 57: Middle East Data Center Construction Market Revenue Million Forecast, by Saudi Arabia 2019 & 2032
- Table 58: Middle East Data Center Construction Market Revenue Million Forecast, by Israel 2019 & 2032
- Table 59: Middle East Data Center Construction Market Revenue Million Forecast, by Qatar 2019 & 2032
- Table 60: Middle East Data Center Construction Market Revenue Million Forecast, by Oman 2019 & 2032
- Table 61: Middle East Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 62: Saudi Arabia Middle East Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 63: United Arab Emirates Middle East Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 64: Israel Middle East Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 65: Qatar Middle East Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 66: Kuwait Middle East Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 67: Oman Middle East Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 68: Bahrain Middle East Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 69: Jordan Middle East Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
- Table 70: Lebanon Middle East Data Center Construction Market Revenue (Million) Forecast, by Application 2019 & 2032
Frequently Asked Questions
1. What is the projected Compound Annual Growth Rate (CAGR) of the Middle East Data Center Construction Market?
The projected CAGR is approximately 14.74%.
2. Which companies are prominent players in the Middle East Data Center Construction Market?
Key companies in the market include Canovate S A, ABB Ltd, Johnson Controls International PLC, Fortis Construction, STULZ GMBH, Delta Group, Schneider Electric SE, Turner Construction Co, DPR Construction Inc, Caterpillar Inc, Airedale International Air Conditioning Ltd, Cummins Inc, AECOM Limited, Legrand, CyrusOne Inc, Future Digital data Systems, Ashi & Bushnag Co Ltd, EAE Group, Alfa Laval AB, Saan Zahav Ltd.
3. What are the main segments of the Middle East Data Center Construction Market?
The market segments include Infrastructure, Electrical Infrastructure, Power Distribution Solution, Power Backup Solutions, Service , Mechanical Infrastructure, Cooling Systems, Racks, Other Mechanical Infrastructure, General Construction, Tier Type, Tier 1 and 2, Tier 3, Tier 4, End User, Banking, Financial Services, and Insurance, IT and Telecommunications, Government and Defense, Healthcare, Other End Users, United Arab Emirates, Saudi Arabia, Israel, Qatar, Oman.
4. Can you provide details about the market size?
The market size is estimated to be USD XX Million as of 2022.
5. What are some drivers contributing to market growth?
Rising Adoption of Renewable Energy Sources; Increase in 5G Deployments Fueling Edge Data Center Investments; Smart City Initiatives Driving Data Center Investments.
6. What are the notable trends driving market growth?
End-User Outlook.
7. Are there any restraints impacting market growth?
Security Challenges in Data Centers; Location Constraints on the Development of Data Centers.
8. Can you provide examples of recent developments in the market?
October 2022: Mohamed bin Ali bin Mohamed Al-Mannai, Minister of Communications and Information Technology, launched the M-VAULT 4's fourth data center building. Customers in Qatar can access cloud services through the Microsoft Cloud data center region housed in the new data center facility.
9. What pricing options are available for accessing the report?
Pricing options include single-user, multi-user, and enterprise licenses priced at USD 4750, USD 5250, and USD 8750 respectively.
10. Is the market size provided in terms of value or volume?
The market size is provided in terms of value, measured in Million.
11. Are there any specific market keywords associated with the report?
Yes, the market keyword associated with the report is "Middle East Data Center Construction Market," which aids in identifying and referencing the specific market segment covered.
12. How do I determine which pricing option suits my needs best?
The pricing options vary based on user requirements and access needs. Individual users may opt for single-user licenses, while businesses requiring broader access may choose multi-user or enterprise licenses for cost-effective access to the report.
13. Are there any additional resources or data provided in the Middle East Data Center Construction Market report?
While the report offers comprehensive insights, it's advisable to review the specific contents or supplementary materials provided to ascertain if additional resources or data are available.
14. How can I stay updated on further developments or reports in the Middle East Data Center Construction Market?
To stay informed about further developments, trends, and reports in the Middle East Data Center Construction Market, consider subscribing to industry newsletters, following relevant companies and organizations, or regularly checking reputable industry news sources and publications.
Methodology
Step 1 - Identification of Relevant Samples Size from Population Database



Step 2 - Approaches for Defining Global Market Size (Value, Volume* & Price*)

Note*: In applicable scenarios
Step 3 - Data Sources
Primary Research
- Web Analytics
- Survey Reports
- Research Institute
- Latest Research Reports
- Opinion Leaders
Secondary Research
- Annual Reports
- White Paper
- Latest Press Release
- Industry Association
- Paid Database
- Investor Presentations

Step 4 - Data Triangulation
Involves using different sources of information in order to increase the validity of a study
These sources are likely to be stakeholders in a program - participants, other researchers, program staff, other community members, and so on.
Then we put all data in single framework & apply various statistical tools to find out the dynamic on the market.
During the analysis stage, feedback from the stakeholder groups would be compared to determine areas of agreement as well as areas of divergence