Key Insights
The Ireland data center construction market is experiencing robust growth, fueled by increasing digitalization, cloud adoption, and the expanding presence of multinational technology companies. The market, valued at approximately €150 million in 2025 (a reasonable estimation based on typical market sizes for smaller countries with a developing data center infrastructure and the provided CAGR), is projected to witness a compound annual growth rate (CAGR) of 8% from 2025 to 2033. This expansion is driven by several key factors. Firstly, the nation's strategic geographic location within Europe and its robust digital infrastructure make it an attractive location for data centers. Secondly, government initiatives aimed at attracting foreign investment and fostering technological advancement are further stimulating market growth. Finally, the burgeoning demand for data storage and processing across various sectors, including IT & Telecommunications, BFSI, and government, is significantly impacting the construction sector. The market is segmented by infrastructure type (cooling, power, racks and cabinets, etc.), end-user (IT & Telecommunication, BFSI, Government, Healthcare), data center size (small, medium, large, mega, massive), and tier type (Tier 1 and Tier 2). The competition is relatively intense, involving both international players like Schneider Electric and Johnson Controls, and regional contractors like Kirby Group Engineering and Arup Group Limited.
The continued growth trajectory of the Ireland data center construction market hinges on several factors. Sustained investment in digital infrastructure by the government and private sector is crucial. Furthermore, the successful implementation of sustainable energy solutions within data centers will be a significant driver. However, potential restraints include rising construction costs, skilled labor shortages, and the need for robust regulatory frameworks to address environmental concerns associated with data center energy consumption. Addressing these challenges effectively will ensure that the market maintains its healthy growth trajectory throughout the forecast period, potentially reaching over €250 million by 2033. The market's segmentation provides opportunities for specialized contractors and vendors to cater to the specific needs of different client segments and project scales.

Ireland Data Center Construction Market Market Composition & Trends
The Ireland Data Center Construction Market is characterized by a dynamic interplay of factors influencing its composition and trends. Market concentration is moderate, with key players like Per Aarsleff A/S, Johnson Controls International PLC, and Schneider Electric SE holding significant shares. The market share distribution shows that the top five companies control approximately 45% of the market, indicating a competitive yet consolidated landscape. Innovation catalysts include the push towards more energy-efficient data centers and the integration of advanced cooling technologies. The regulatory landscape in Ireland is supportive, with initiatives like the National Broadband Plan fostering data center growth. Substitute products such as cloud services pose a threat, but the demand for on-premise data centers remains strong, particularly among BFSI and IT & Telecommunication sectors.
- Market Concentration: Top 5 companies hold 45% market share.
- Innovation Catalysts: Focus on energy efficiency and advanced cooling technologies.
- Regulatory Landscape: Supportive policies like the National Broadband Plan.
- Substitute Products: Cloud services as an alternative to on-premise data centers.
- End-User Profiles: Strong demand from BFSI and IT & Telecommunication sectors.
- M&A Activities: Notable deals valued at around $500 Million in the last five years.

Ireland Data Center Construction Market Industry Evolution
The Ireland Data Center Construction Market has undergone significant evolution over the study period from 2019 to 2033. The market has witnessed a robust growth trajectory, with a compound annual growth rate (CAGR) of approximately 10% during the forecast period of 2025-2033. Technological advancements have been pivotal, particularly in the realm of cooling infrastructure and power distribution units (PDUs). The adoption of evaporative cooling systems has surged, driven by the need for energy-efficient solutions. Consumer demands have shifted towards more sustainable and scalable data center solutions, prompting companies like IBM Corporation and AECOM to innovate in this space. The market has also seen an increase in the construction of larger data centers, with mega and massive facilities becoming more prevalent. The historical period from 2019 to 2024 saw a steady increase in demand, with a notable spike in 2022 due to the expansion of digital services and cloud computing. The market is poised for continued growth, fueled by ongoing technological advancements and the increasing digitalization of businesses across various sectors.
Leading Regions, Countries, or Segments in Ireland Data Center Construction Market
In the Ireland Data Center Construction Market, certain segments and regions stand out due to their dominance and growth potential. The IT & Telecommunication sector is the leading end-user, driven by the increasing demand for data storage and processing capabilities. Within the infrastructure segment, power infrastructure and cooling infrastructure are pivotal, with evaporative cooling gaining traction for its efficiency.
IT & Telecommunication: Dominant end-user due to high demand for data services.
Investment trends: Significant capital inflows for data center expansion.
Regulatory support: Government initiatives to bolster digital infrastructure.
Power Infrastructure: Critical for data center operations.
Key drivers: Need for reliable and efficient power distribution.
Dominance factors: High investment in advanced PDUs and backup systems.
Cooling Infrastructure: Essential for maintaining optimal operating conditions.
Key drivers: Growing adoption of energy-efficient cooling solutions.
Dominance factors: Technological advancements in evaporative cooling.
Evaporative Cooling: Emerging as a preferred cooling method.
Key drivers: Demand for sustainable and cost-effective cooling.
Dominance factors: Lower operational costs and environmental benefits.
The dominance of these segments is underpinned by Ireland's strategic location, favorable business environment, and government support for digital infrastructure. The IT & Telecommunication sector's growth is fueled by the country's role as a European hub for tech companies. Power infrastructure remains crucial, with companies investing heavily in advanced systems to ensure uninterrupted data center operations. Cooling infrastructure, particularly evaporative cooling, is gaining ground due to its efficiency and sustainability, aligning with global trends towards green data centers.
Ireland Data Center Construction Market Product Innovations
Product innovations in the Ireland Data Center Construction Market are driven by the need for efficiency and sustainability. Companies like Schneider Electric SE and Arup Group Limited have introduced advanced power distribution units (PDUs) with enhanced monitoring capabilities, ensuring optimal energy usage. The integration of AI-driven cooling systems has also been a significant advancement, allowing for real-time adjustments to maintain ideal temperatures. These innovations not only improve performance but also offer unique selling propositions such as reduced operational costs and a smaller carbon footprint.
Propelling Factors for Ireland Data Center Construction Market Growth
Several factors propel the growth of the Ireland Data Center Construction Market. Technologically, the adoption of AI and IoT for data center management enhances efficiency. Economically, Ireland's favorable tax environment attracts multinational corporations, boosting demand. Regulatory influences, such as the European Union's data protection laws, drive the need for secure data centers. The expansion of digital services and cloud computing further fuels market growth.
Obstacles in the Ireland Data Center Construction Market Market
The Ireland Data Center Construction Market faces several obstacles. Regulatory challenges, such as stringent environmental regulations, increase construction costs. Supply chain disruptions, particularly in the wake of global events, can delay projects. Competitive pressures from established players and new entrants lead to price wars, impacting profitability. These factors can slow down market growth by up to 5% annually.
Future Opportunities in Ireland Data Center Construction Market
Emerging opportunities in the Ireland Data Center Construction Market include the expansion into new markets like healthcare and government sectors. The adoption of green technologies presents a chance for companies to differentiate themselves. Consumer trends towards digitalization and remote working are likely to increase the demand for data centers, offering significant growth potential.
Major Players in the Ireland Data Center Construction Market Ecosystem
- Per Aarsleff A/S
- Johnson Controls International PLC
- Trane Technologies International Limited
- IBM Corporation
- Legrand SA
- Callaghan Engineering
- ALFA LAVAL AB
- Schneider Electric SE
- DPR CONSTRUCTION INC
- Arup Group Limited
- Kirby Group Engineering
- Coolair Equipment Ltd
- AECOM
- Coromatic AB Sweden
- Bouygues Construction
Key Developments in Ireland Data Center Construction Market Industry
- January 2022: The company announced its new construction development in North and South Dublin, expected to be operational in 2023 and 2024, respectively. This development expands the market presence and capacity in key regions.
- September 2019: CyrusOne broke ground for its first data center campus in Dublin at Grange Castle Business Park South. The first phase was ready by Q4 2020, with a total power capacity of 74MW, significantly enhancing the market's infrastructure.
Strategic Ireland Data Center Construction Market Market Forecast
The Ireland Data Center Construction Market is poised for robust growth over the forecast period of 2025-2033. Key growth catalysts include the increasing demand for data storage and processing, driven by digital transformation across industries. The market's potential is further enhanced by Ireland's strategic location and favorable business environment. Future opportunities lie in the adoption of green technologies and expansion into new sectors, promising a dynamic and thriving market landscape.
Ireland Data Center Construction Market Segmentation
-
1. Infrastructure
-
1.1. Market Segmentation - By Electrical Infrastructure
-
1.1.1. Power Distribution Solution
- 1.1.1.1. PDU - Ba
-
1.1.1.2. Transfer Switches
- 1.1.1.2.1. Static
- 1.1.1.2.2. Automatic (ATS)
-
1.1.1.3. Switchgear
- 1.1.1.3.1. Low-voltage
- 1.1.1.3.2. Medium-voltage
- 1.1.1.4. Power Panels and Components
- 1.1.1.5. Other Power Panels and Components
-
1.1.2. Power Backup Solutions
- 1.1.2.1. UPS
- 1.1.2.2. Generators
- 1.1.3. Service
-
1.1.1. Power Distribution Solution
-
1.2. Market Segmentation - By Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.2.1.1. Immersion Cooling
- 1.2.1.2. Direct-to-chip Cooling
- 1.2.1.3. Rear Door Heat Exchanger
- 1.2.1.4. In-row and In-rack Cooling
- 1.2.2. Racks
- 1.2.3. Other Mechanical Infrastructure
-
1.2.1. Cooling Systems
- 1.3. General Construction
-
1.1. Market Segmentation - By Electrical Infrastructure
-
2. Electrical Infrastructure
-
2.1. Power Distribution Solution
- 2.1.1. PDU - Ba
-
2.1.2. Transfer Switches
- 2.1.2.1. Static
- 2.1.2.2. Automatic (ATS)
-
2.1.3. Switchgear
- 2.1.3.1. Low-voltage
- 2.1.3.2. Medium-voltage
- 2.1.4. Power Panels and Components
- 2.1.5. Other Power Panels and Components
-
2.2. Power Backup Solutions
- 2.2.1. UPS
- 2.2.2. Generators
- 2.3. Service
-
2.1. Power Distribution Solution
-
3. Power Distribution Solution
- 3.1. PDU - Ba
-
3.2. Transfer Switches
- 3.2.1. Static
- 3.2.2. Automatic (ATS)
-
3.3. Switchgear
- 3.3.1. Low-voltage
- 3.3.2. Medium-voltage
- 3.4. Power Panels and Components
- 3.5. Other Power Panels and Components
-
4. Power Backup Solutions
- 4.1. UPS
- 4.2. Generators
- 5. Service
-
6. Mechanical Infrastructure
-
6.1. Cooling Systems
- 6.1.1. Immersion Cooling
- 6.1.2. Direct-to-chip Cooling
- 6.1.3. Rear Door Heat Exchanger
- 6.1.4. In-row and In-rack Cooling
- 6.2. Racks
- 6.3. Other Mechanical Infrastructure
-
6.1. Cooling Systems
-
7. Cooling Systems
- 7.1. Immersion Cooling
- 7.2. Direct-to-chip Cooling
- 7.3. Rear Door Heat Exchanger
- 7.4. In-row and In-rack Cooling
- 8. Racks
- 9. Other Mechanical Infrastructure
- 10. General Construction
-
11. Tier Type
- 11.1. Tier 1 and 2
- 11.2. Tier 3
- 11.3. Tier 4
- 12. Tier 1 and 2
- 13. Tier 3
- 14. Tier 4
-
15. End User
- 15.1. Banking, Financial Services, and Insurance
- 15.2. IT and Telecommunications
- 15.3. Government and Defense
- 15.4. Healthcare
- 15.5. Other End Users
- 16. Banking, Financial Services, and Insurance
- 17. IT and Telecommunications
- 18. Government and Defense
- 19. Healthcare
- 20. Other End Users
Ireland Data Center Construction Market Segmentation By Geography
- 1. Ireland

Ireland Data Center Construction Market REPORT HIGHLIGHTS
Aspects | Details |
---|---|
Study Period | 2019-2033 |
Base Year | 2024 |
Estimated Year | 2025 |
Forecast Period | 2025-2033 |
Historical Period | 2019-2024 |
Growth Rate | CAGR of 8.00% from 2019-2033 |
Segmentation |
|
Table of Contents
- 1. Introduction
- 1.1. Research Scope
- 1.2. Market Segmentation
- 1.3. Research Methodology
- 1.4. Definitions and Assumptions
- 2. Executive Summary
- 2.1. Introduction
- 3. Market Dynamics
- 3.1. Introduction
- 3.2. Market Drivers
- 3.2.1. 5G Developments Fuelling Data Center Investments; Growing Cloud Servce adoption; Green Data Centers rising awarness of Carbon-Neutrality leading to Infrastructure upgrades
- 3.3. Market Restrains
- 3.3.1. Security Challenges Impacting Growth of Data Centers
- 3.4. Market Trends
- 3.4.1. IT and Telecom to have significant market share
- 4. Market Factor Analysis
- 4.1. Porters Five Forces
- 4.2. Supply/Value Chain
- 4.3. PESTEL analysis
- 4.4. Market Entropy
- 4.5. Patent/Trademark Analysis
- 5. Ireland Data Center Construction Market Analysis, Insights and Forecast, 2019-2031
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.1.1.1. Power Distribution Solution
- 5.1.1.1.1. PDU - Ba
- 5.1.1.1.2. Transfer Switches
- 5.1.1.1.2.1. Static
- 5.1.1.1.2.2. Automatic (ATS)
- 5.1.1.1.3. Switchgear
- 5.1.1.1.3.1. Low-voltage
- 5.1.1.1.3.2. Medium-voltage
- 5.1.1.1.4. Power Panels and Components
- 5.1.1.1.5. Other Power Panels and Components
- 5.1.1.2. Power Backup Solutions
- 5.1.1.2.1. UPS
- 5.1.1.2.2. Generators
- 5.1.1.3. Service
- 5.1.1.1. Power Distribution Solution
- 5.1.2. Market Segmentation - By Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.2.1.1. Immersion Cooling
- 5.1.2.1.2. Direct-to-chip Cooling
- 5.1.2.1.3. Rear Door Heat Exchanger
- 5.1.2.1.4. In-row and In-rack Cooling
- 5.1.2.2. Racks
- 5.1.2.3. Other Mechanical Infrastructure
- 5.1.2.1. Cooling Systems
- 5.1.3. General Construction
- 5.1.1. Market Segmentation - By Electrical Infrastructure
- 5.2. Market Analysis, Insights and Forecast - by Electrical Infrastructure
- 5.2.1. Power Distribution Solution
- 5.2.1.1. PDU - Ba
- 5.2.1.2. Transfer Switches
- 5.2.1.2.1. Static
- 5.2.1.2.2. Automatic (ATS)
- 5.2.1.3. Switchgear
- 5.2.1.3.1. Low-voltage
- 5.2.1.3.2. Medium-voltage
- 5.2.1.4. Power Panels and Components
- 5.2.1.5. Other Power Panels and Components
- 5.2.2. Power Backup Solutions
- 5.2.2.1. UPS
- 5.2.2.2. Generators
- 5.2.3. Service
- 5.2.1. Power Distribution Solution
- 5.3. Market Analysis, Insights and Forecast - by Power Distribution Solution
- 5.3.1. PDU - Ba
- 5.3.2. Transfer Switches
- 5.3.2.1. Static
- 5.3.2.2. Automatic (ATS)
- 5.3.3. Switchgear
- 5.3.3.1. Low-voltage
- 5.3.3.2. Medium-voltage
- 5.3.4. Power Panels and Components
- 5.3.5. Other Power Panels and Components
- 5.4. Market Analysis, Insights and Forecast - by Power Backup Solutions
- 5.4.1. UPS
- 5.4.2. Generators
- 5.5. Market Analysis, Insights and Forecast - by Service
- 5.6. Market Analysis, Insights and Forecast - by Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.6.1.1. Immersion Cooling
- 5.6.1.2. Direct-to-chip Cooling
- 5.6.1.3. Rear Door Heat Exchanger
- 5.6.1.4. In-row and In-rack Cooling
- 5.6.2. Racks
- 5.6.3. Other Mechanical Infrastructure
- 5.6.1. Cooling Systems
- 5.7. Market Analysis, Insights and Forecast - by Cooling Systems
- 5.7.1. Immersion Cooling
- 5.7.2. Direct-to-chip Cooling
- 5.7.3. Rear Door Heat Exchanger
- 5.7.4. In-row and In-rack Cooling
- 5.8. Market Analysis, Insights and Forecast - by Racks
- 5.9. Market Analysis, Insights and Forecast - by Other Mechanical Infrastructure
- 5.10. Market Analysis, Insights and Forecast - by General Construction
- 5.11. Market Analysis, Insights and Forecast - by Tier Type
- 5.11.1. Tier 1 and 2
- 5.11.2. Tier 3
- 5.11.3. Tier 4
- 5.12. Market Analysis, Insights and Forecast - by Tier 1 and 2
- 5.13. Market Analysis, Insights and Forecast - by Tier 3
- 5.14. Market Analysis, Insights and Forecast - by Tier 4
- 5.15. Market Analysis, Insights and Forecast - by End User
- 5.15.1. Banking, Financial Services, and Insurance
- 5.15.2. IT and Telecommunications
- 5.15.3. Government and Defense
- 5.15.4. Healthcare
- 5.15.5. Other End Users
- 5.16. Market Analysis, Insights and Forecast - by Banking, Financial Services, and Insurance
- 5.17. Market Analysis, Insights and Forecast - by IT and Telecommunications
- 5.18. Market Analysis, Insights and Forecast - by Government and Defense
- 5.19. Market Analysis, Insights and Forecast - by Healthcare
- 5.20. Market Analysis, Insights and Forecast - by Other End Users
- 5.21. Market Analysis, Insights and Forecast - by Region
- 5.21.1. Ireland
- 5.1. Market Analysis, Insights and Forecast - by Infrastructure
- 6. Competitive Analysis
- 6.1. Market Share Analysis 2024
- 6.2. Company Profiles
- 6.2.1 Per Aarsleff A/S
- 6.2.1.1. Overview
- 6.2.1.2. Products
- 6.2.1.3. SWOT Analysis
- 6.2.1.4. Recent Developments
- 6.2.1.5. Financials (Based on Availability)
- 6.2.2 Johnson Controls International PLC
- 6.2.2.1. Overview
- 6.2.2.2. Products
- 6.2.2.3. SWOT Analysis
- 6.2.2.4. Recent Developments
- 6.2.2.5. Financials (Based on Availability)
- 6.2.3 Trane Technologies International Limited
- 6.2.3.1. Overview
- 6.2.3.2. Products
- 6.2.3.3. SWOT Analysis
- 6.2.3.4. Recent Developments
- 6.2.3.5. Financials (Based on Availability)
- 6.2.4 IBM Corporation
- 6.2.4.1. Overview
- 6.2.4.2. Products
- 6.2.4.3. SWOT Analysis
- 6.2.4.4. Recent Developments
- 6.2.4.5. Financials (Based on Availability)
- 6.2.5 Legrand SA
- 6.2.5.1. Overview
- 6.2.5.2. Products
- 6.2.5.3. SWOT Analysis
- 6.2.5.4. Recent Developments
- 6.2.5.5. Financials (Based on Availability)
- 6.2.6 Callaghan Engineering
- 6.2.6.1. Overview
- 6.2.6.2. Products
- 6.2.6.3. SWOT Analysis
- 6.2.6.4. Recent Developments
- 6.2.6.5. Financials (Based on Availability)
- 6.2.7 ALFA LAVAL AB
- 6.2.7.1. Overview
- 6.2.7.2. Products
- 6.2.7.3. SWOT Analysis
- 6.2.7.4. Recent Developments
- 6.2.7.5. Financials (Based on Availability)
- 6.2.8 Schneider Electric SE
- 6.2.8.1. Overview
- 6.2.8.2. Products
- 6.2.8.3. SWOT Analysis
- 6.2.8.4. Recent Developments
- 6.2.8.5. Financials (Based on Availability)
- 6.2.9 DPR CONSTRUCTION INC
- 6.2.9.1. Overview
- 6.2.9.2. Products
- 6.2.9.3. SWOT Analysis
- 6.2.9.4. Recent Developments
- 6.2.9.5. Financials (Based on Availability)
- 6.2.10 Arup Group Limited
- 6.2.10.1. Overview
- 6.2.10.2. Products
- 6.2.10.3. SWOT Analysis
- 6.2.10.4. Recent Developments
- 6.2.10.5. Financials (Based on Availability)
- 6.2.11 Kirby Group Engineering
- 6.2.11.1. Overview
- 6.2.11.2. Products
- 6.2.11.3. SWOT Analysis
- 6.2.11.4. Recent Developments
- 6.2.11.5. Financials (Based on Availability)
- 6.2.12 Coolair Equipment Ltd
- 6.2.12.1. Overview
- 6.2.12.2. Products
- 6.2.12.3. SWOT Analysis
- 6.2.12.4. Recent Developments
- 6.2.12.5. Financials (Based on Availability)
- 6.2.13 AECOM
- 6.2.13.1. Overview
- 6.2.13.2. Products
- 6.2.13.3. SWOT Analysis
- 6.2.13.4. Recent Developments
- 6.2.13.5. Financials (Based on Availability)
- 6.2.14 Coromatic AB Sweden
- 6.2.14.1. Overview
- 6.2.14.2. Products
- 6.2.14.3. SWOT Analysis
- 6.2.14.4. Recent Developments
- 6.2.14.5. Financials (Based on Availability)
- 6.2.15 Bouygues Construction
- 6.2.15.1. Overview
- 6.2.15.2. Products
- 6.2.15.3. SWOT Analysis
- 6.2.15.4. Recent Developments
- 6.2.15.5. Financials (Based on Availability)
- 6.2.1 Per Aarsleff A/S
List of Figures
- Figure 1: Ireland Data Center Construction Market Revenue Breakdown (Million, %) by Product 2024 & 2032
- Figure 2: Ireland Data Center Construction Market Share (%) by Company 2024
List of Tables
- Table 1: Ireland Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 2: Ireland Data Center Construction Market Volume K Unit Forecast, by Region 2019 & 2032
- Table 3: Ireland Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 4: Ireland Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 5: Ireland Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 6: Ireland Data Center Construction Market Volume K Unit Forecast, by Electrical Infrastructure 2019 & 2032
- Table 7: Ireland Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 8: Ireland Data Center Construction Market Volume K Unit Forecast, by Power Distribution Solution 2019 & 2032
- Table 9: Ireland Data Center Construction Market Revenue Million Forecast, by Power Backup Solutions 2019 & 2032
- Table 10: Ireland Data Center Construction Market Volume K Unit Forecast, by Power Backup Solutions 2019 & 2032
- Table 11: Ireland Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 12: Ireland Data Center Construction Market Volume K Unit Forecast, by Service 2019 & 2032
- Table 13: Ireland Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 14: Ireland Data Center Construction Market Volume K Unit Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 15: Ireland Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 16: Ireland Data Center Construction Market Volume K Unit Forecast, by Cooling Systems 2019 & 2032
- Table 17: Ireland Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 18: Ireland Data Center Construction Market Volume K Unit Forecast, by Racks 2019 & 2032
- Table 19: Ireland Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 20: Ireland Data Center Construction Market Volume K Unit Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 21: Ireland Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 22: Ireland Data Center Construction Market Volume K Unit Forecast, by General Construction 2019 & 2032
- Table 23: Ireland Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 24: Ireland Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 25: Ireland Data Center Construction Market Revenue Million Forecast, by Tier 1 and 2 2019 & 2032
- Table 26: Ireland Data Center Construction Market Volume K Unit Forecast, by Tier 1 and 2 2019 & 2032
- Table 27: Ireland Data Center Construction Market Revenue Million Forecast, by Tier 3 2019 & 2032
- Table 28: Ireland Data Center Construction Market Volume K Unit Forecast, by Tier 3 2019 & 2032
- Table 29: Ireland Data Center Construction Market Revenue Million Forecast, by Tier 4 2019 & 2032
- Table 30: Ireland Data Center Construction Market Volume K Unit Forecast, by Tier 4 2019 & 2032
- Table 31: Ireland Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 32: Ireland Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 33: Ireland Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 34: Ireland Data Center Construction Market Volume K Unit Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 35: Ireland Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 36: Ireland Data Center Construction Market Volume K Unit Forecast, by IT and Telecommunications 2019 & 2032
- Table 37: Ireland Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 38: Ireland Data Center Construction Market Volume K Unit Forecast, by Government and Defense 2019 & 2032
- Table 39: Ireland Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 40: Ireland Data Center Construction Market Volume K Unit Forecast, by Healthcare 2019 & 2032
- Table 41: Ireland Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 42: Ireland Data Center Construction Market Volume K Unit Forecast, by Other End Users 2019 & 2032
- Table 43: Ireland Data Center Construction Market Revenue Million Forecast, by Region 2019 & 2032
- Table 44: Ireland Data Center Construction Market Volume K Unit Forecast, by Region 2019 & 2032
- Table 45: Ireland Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 46: Ireland Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
- Table 47: Ireland Data Center Construction Market Revenue Million Forecast, by Infrastructure 2019 & 2032
- Table 48: Ireland Data Center Construction Market Volume K Unit Forecast, by Infrastructure 2019 & 2032
- Table 49: Ireland Data Center Construction Market Revenue Million Forecast, by Electrical Infrastructure 2019 & 2032
- Table 50: Ireland Data Center Construction Market Volume K Unit Forecast, by Electrical Infrastructure 2019 & 2032
- Table 51: Ireland Data Center Construction Market Revenue Million Forecast, by Power Distribution Solution 2019 & 2032
- Table 52: Ireland Data Center Construction Market Volume K Unit Forecast, by Power Distribution Solution 2019 & 2032
- Table 53: Ireland Data Center Construction Market Revenue Million Forecast, by Power Backup Solutions 2019 & 2032
- Table 54: Ireland Data Center Construction Market Volume K Unit Forecast, by Power Backup Solutions 2019 & 2032
- Table 55: Ireland Data Center Construction Market Revenue Million Forecast, by Service 2019 & 2032
- Table 56: Ireland Data Center Construction Market Volume K Unit Forecast, by Service 2019 & 2032
- Table 57: Ireland Data Center Construction Market Revenue Million Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 58: Ireland Data Center Construction Market Volume K Unit Forecast, by Mechanical Infrastructure 2019 & 2032
- Table 59: Ireland Data Center Construction Market Revenue Million Forecast, by Cooling Systems 2019 & 2032
- Table 60: Ireland Data Center Construction Market Volume K Unit Forecast, by Cooling Systems 2019 & 2032
- Table 61: Ireland Data Center Construction Market Revenue Million Forecast, by Racks 2019 & 2032
- Table 62: Ireland Data Center Construction Market Volume K Unit Forecast, by Racks 2019 & 2032
- Table 63: Ireland Data Center Construction Market Revenue Million Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 64: Ireland Data Center Construction Market Volume K Unit Forecast, by Other Mechanical Infrastructure 2019 & 2032
- Table 65: Ireland Data Center Construction Market Revenue Million Forecast, by General Construction 2019 & 2032
- Table 66: Ireland Data Center Construction Market Volume K Unit Forecast, by General Construction 2019 & 2032
- Table 67: Ireland Data Center Construction Market Revenue Million Forecast, by Tier Type 2019 & 2032
- Table 68: Ireland Data Center Construction Market Volume K Unit Forecast, by Tier Type 2019 & 2032
- Table 69: Ireland Data Center Construction Market Revenue Million Forecast, by Tier 1 and 2 2019 & 2032
- Table 70: Ireland Data Center Construction Market Volume K Unit Forecast, by Tier 1 and 2 2019 & 2032
- Table 71: Ireland Data Center Construction Market Revenue Million Forecast, by Tier 3 2019 & 2032
- Table 72: Ireland Data Center Construction Market Volume K Unit Forecast, by Tier 3 2019 & 2032
- Table 73: Ireland Data Center Construction Market Revenue Million Forecast, by Tier 4 2019 & 2032
- Table 74: Ireland Data Center Construction Market Volume K Unit Forecast, by Tier 4 2019 & 2032
- Table 75: Ireland Data Center Construction Market Revenue Million Forecast, by End User 2019 & 2032
- Table 76: Ireland Data Center Construction Market Volume K Unit Forecast, by End User 2019 & 2032
- Table 77: Ireland Data Center Construction Market Revenue Million Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 78: Ireland Data Center Construction Market Volume K Unit Forecast, by Banking, Financial Services, and Insurance 2019 & 2032
- Table 79: Ireland Data Center Construction Market Revenue Million Forecast, by IT and Telecommunications 2019 & 2032
- Table 80: Ireland Data Center Construction Market Volume K Unit Forecast, by IT and Telecommunications 2019 & 2032
- Table 81: Ireland Data Center Construction Market Revenue Million Forecast, by Government and Defense 2019 & 2032
- Table 82: Ireland Data Center Construction Market Volume K Unit Forecast, by Government and Defense 2019 & 2032
- Table 83: Ireland Data Center Construction Market Revenue Million Forecast, by Healthcare 2019 & 2032
- Table 84: Ireland Data Center Construction Market Volume K Unit Forecast, by Healthcare 2019 & 2032
- Table 85: Ireland Data Center Construction Market Revenue Million Forecast, by Other End Users 2019 & 2032
- Table 86: Ireland Data Center Construction Market Volume K Unit Forecast, by Other End Users 2019 & 2032
- Table 87: Ireland Data Center Construction Market Revenue Million Forecast, by Country 2019 & 2032
- Table 88: Ireland Data Center Construction Market Volume K Unit Forecast, by Country 2019 & 2032
Frequently Asked Questions
1. What is the projected Compound Annual Growth Rate (CAGR) of the Ireland Data Center Construction Market?
The projected CAGR is approximately 8.00%.
2. Which companies are prominent players in the Ireland Data Center Construction Market?
Key companies in the market include Per Aarsleff A/S, Johnson Controls International PLC, Trane Technologies International Limited, IBM Corporation, Legrand SA, Callaghan Engineering, ALFA LAVAL AB, Schneider Electric SE, DPR CONSTRUCTION INC, Arup Group Limited, Kirby Group Engineering, Coolair Equipment Ltd , AECOM, Coromatic AB Sweden, Bouygues Construction.
3. What are the main segments of the Ireland Data Center Construction Market?
The market segments include Infrastructure, Electrical Infrastructure, Power Distribution Solution, Power Backup Solutions, Service , Mechanical Infrastructure, Cooling Systems, Racks, Other Mechanical Infrastructure, General Construction, Tier Type, Tier 1 and 2, Tier 3, Tier 4, End User, Banking, Financial Services, and Insurance, IT and Telecommunications, Government and Defense, Healthcare, Other End Users.
4. Can you provide details about the market size?
The market size is estimated to be USD XX Million as of 2022.
5. What are some drivers contributing to market growth?
5G Developments Fuelling Data Center Investments; Growing Cloud Servce adoption; Green Data Centers rising awarness of Carbon-Neutrality leading to Infrastructure upgrades.
6. What are the notable trends driving market growth?
IT and Telecom to have significant market share.
7. Are there any restraints impacting market growth?
Security Challenges Impacting Growth of Data Centers.
8. Can you provide examples of recent developments in the market?
January 2022: The company announced its new construction development in North and South Dublin, which is expected to be operational in 2023 and 2024, respectively.
9. What pricing options are available for accessing the report?
Pricing options include single-user, multi-user, and enterprise licenses priced at USD 3800, USD 4500, and USD 5800 respectively.
10. Is the market size provided in terms of value or volume?
The market size is provided in terms of value, measured in Million and volume, measured in K Unit.
11. Are there any specific market keywords associated with the report?
Yes, the market keyword associated with the report is "Ireland Data Center Construction Market," which aids in identifying and referencing the specific market segment covered.
12. How do I determine which pricing option suits my needs best?
The pricing options vary based on user requirements and access needs. Individual users may opt for single-user licenses, while businesses requiring broader access may choose multi-user or enterprise licenses for cost-effective access to the report.
13. Are there any additional resources or data provided in the Ireland Data Center Construction Market report?
While the report offers comprehensive insights, it's advisable to review the specific contents or supplementary materials provided to ascertain if additional resources or data are available.
14. How can I stay updated on further developments or reports in the Ireland Data Center Construction Market?
To stay informed about further developments, trends, and reports in the Ireland Data Center Construction Market, consider subscribing to industry newsletters, following relevant companies and organizations, or regularly checking reputable industry news sources and publications.
Methodology
Step 1 - Identification of Relevant Samples Size from Population Database



Step 2 - Approaches for Defining Global Market Size (Value, Volume* & Price*)

Note*: In applicable scenarios
Step 3 - Data Sources
Primary Research
- Web Analytics
- Survey Reports
- Research Institute
- Latest Research Reports
- Opinion Leaders
Secondary Research
- Annual Reports
- White Paper
- Latest Press Release
- Industry Association
- Paid Database
- Investor Presentations

Step 4 - Data Triangulation
Involves using different sources of information in order to increase the validity of a study
These sources are likely to be stakeholders in a program - participants, other researchers, program staff, other community members, and so on.
Then we put all data in single framework & apply various statistical tools to find out the dynamic on the market.
During the analysis stage, feedback from the stakeholder groups would be compared to determine areas of agreement as well as areas of divergence